Irrigation And Waterways Department Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Irrigation And Waterways Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date12 Apr 2025
Closing Date7 May 2025
Tender Amount₹ 5,42,518 
Notes
Download

Costs

Summary

Wbiw Ee-i Ldcd E-nit- 2 2025-26 Sl 26

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I) In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means a) upto 3 m depth (ii) With pumping out water excluding shoring

9.39

146

1376.48

... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. b) Where staging is not required.

83.71

255

21350.24

... More
Supplying, fitting and placing un-coated HYSD bar reinforcement in Bridge Foundation including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge. 2(ii)b Tor Steel rods /HYSD bars /TMT bars (JSW/JSPL/Shyam/SRMB/SSL / BMASL / Eletrosteel) (Fe 415/Fe 500/Fe 500 D.conforms to IS:1786)

1.56

64123

100033.17

... More
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. (iii) 15 cm av. diameter Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end.

270

258

69827.4

... More
Labour for driving Jhaw / Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (iii) 15 cm av. diameter Note: 1) Payment to be made on the length driven into the ground. Diameterto be measured at 1.5m. from the thicker end.

271.4

125

33963

... More
Supplying to site empty cement polythene bags(capacity50kg) in good condition including stacking , incedental charges etc.all complete (capacity 50 kg).

3482

7

24896.3

... More
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028cum/ bag.

3482

8

29039.88

... More
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.

3482

3

12465.56

... More
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof.

13.8

532

7351.67

... More
Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of E) Beyond 4.00 km and upto 5.00 km NB :- Measurement to be taken on the basis of stack measurement / pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Earth work note for Royalty:- (This rate is includes for compensation for earth for land owned/arranged by the contractor @ Rs. 25.00 per m3 and royalty charges on earth @ 29.00 per m3 & Cesses chagges @ Rs. 5.30 per m3 ( i.e., Rs. 15.00 per 100 cft. ), as per Govt. notification which will be paid on production of necessary documents in support of payment made towards the royalty & Cesses.) (The payment is to be made on the basis of the finished compacted volume.) Specified in 6th corrigenda PWD( Road & Bridge)

97.5

371

36172.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.