Irrigation And Waterways Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Eprocure
Opening Date13 Feb 2021
Closing Date27 Feb 2021
Tender Amount₹ 9,42,548 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 18,851Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbiw/ee/apd/nit-15(e)/20-21 (sl 12)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_IWD_326213_12Bid Award Id
ViewTender No
WBIW/EE/APD/NIT-15(e)/2020-21Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Boulder comprising of above 30k.g 70% ,20 kg 20% & 10 kg.10% each. (Quarry bed belongs to Forest Deptt Govt of W.B) N.B.-The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry side till such rates are modified by the forest department and department of industry, commerce and enterprises, Government of West Bengal.(a) for forest area royalty including entry fee and TP fee: Rs. 91.25 per cum Royalty (including other charges where ever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty (including othere charges where ever applicable, but excluding GST) will be deducted from the bills of works.
100
-
1249.58
... More
Quarrying ,Carrying ,Supplying stone boulders/shingles from the Engineer in Charge selected quarrying site to the site of work including cost of materials,loading,unloading and carriage including all incidental charges like Royalty but exclusive labour charges for laying boulder in apron as per direction of the Engineer In Charge.(Quarry bed belongs to Forest Dept. Govt. Of WB)
-
-
-
... More
Boulder comprising of above 30k.g 70% ,20 kg 20% & 10 kg.10% each. (Quarry bed belongs to Forest Deptt Govt of W.B) N.B.-The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry side till such rates are modified by the forest department and department of industry, commerce and enterprises, Government of West Bengal.(a) for forest area royalty including entry fee and TP fee: Rs. 91.25 per cum Royalty (including other charges where ever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty (including othere charges where ever applicable, but excluding GST) will be deducted from the bills of works.
378
-
983.75
... More
Quarrying ,Carrying ,Supplying stone boulders/shingles from the Engineer in Charge selected quarrying site to the site of work including cost of materials,loading,unloading and carriage including all incidental charges like Royalty and labour charges for boulder pitching on top and slope by placing required boulders (Boulder above 30 k.g each within lead of 100 mtr.s and all lifts) including filling the interstices with fragments as required,preparing sub grade by cutting or filling the earth on slope upto 7.50 c.m depth,watering and ramming where necessary complete but excluding the cost of shingle of filling materials as per as per direction of the Engineer In Charge.
-
-
-
... More
Boulder comprising of above 30k.g 70% ,20 kg 20% & 10 kg.10% each. (Quarry bed belongs to Forest Deptt Govt of W.B) N.B.-The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry side till such rates are modified by the forest department and department of industry, commerce and enterprises, Government of West Bengal.(a) for forest area royalty including entry fee and TP fee: Rs. 91.25 per cum Royalty (including other charges where ever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty (including othere charges where ever applicable, but excluding GST) will be deducted from the bills of works.
69
-
1550.48
... More
Quarrying ,Carrying ,Supplying shingles from the Engineer in Charge selected quarrying site to the site of work including cost of materials,loading,unloading ,stacking and carriage including all incidental charges like Royalty and labour charges for providing filter with well graded 40 mm. down shinglesand laying uniformly below pitching on bed,side slopes including preaparing bed with earth work upto 30 c.m depth ,where necessary and compacting as per direction of the Engineer In Charge and including all leads and lifts complete..
-
-
-
... More
Shingles for slope. (Quarry bed belongs to L & LR Dept. , Govt. Of WB) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. For Non-Forest area Royalty : Rs. 53.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
20
-
1126.11
... More
Quarrying ,Carrying ,Supplying stone boulders/shingles from the Engineer in Charge selected quarrying site to the site of work including cost of materials,loading,unloading ,stacking and carriage including all incidental charges like Royalty .
-
-
-
... More
Shingles for interstices. (Quarry bed belongs to L & LR Dept. , Govt. Of WB) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. For Non-Forest area Royalty : Rs. 53.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
11
-
718.88
... More
Making rectangular/circular sausage cage with 10 SWG galvanized iron wire of 150mm x 150mm. Mesh wire netting with proper lapping of minimum 150mm. Including sewing the joints with 12SWG G.I. wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder/lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces)
-
-
-
... More
Round size 1.50m. dia.
250
-
952.47
... More
Supplying ,fitting,fixing end pieces for rectangular/square/circular sausages at rhe ends, with 10 SWG/8SWG G.I wire net of different mesh sizes tying & sewing the same maintaing a lap length of 150mm. All around with 12 SWG G.I wire complete including the cost of supply of wire netting fitting etc. complete as per direction of the Engineer-In-Charge.
-
-
-
... More
Mesh size 150mm x 150mm with 10 SWG wire
190
-
105.2
... More
Caulking joints of laterite/stone boulder or brick pitching with cement mortar 1:4 and flush pointing as per direction of the Engineer-in-charge.
-
-
-
... More
Stone/laterite boulderr pitching
226
-
142.53
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements