Irrigation And Waterways Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Civil And Construction
Eprocure
Opening Date22 Feb 2019
Closing Date23 Mar 2019
Tender Amount₹ 1,35,26,363 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 2,70,527Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbiw/se/wc-ii/nit-21e/2018-19, Sl No 01
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_IWD_218184_1Bid Award Id
ViewTender No
WBIW/SE/WC-II/NIT-21e/2018-19Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
a) Depth up to 150 mm.
3120
-
16.29
... More
(b) For each additional Depth of 150mm and part
3120
-
21.49
... More
Spreading blindage for road topping using sand / moorum / kiln rubbish etc. in approximately 6mm thick layer, including watering and rolling complete.
6000
-
7.13
... More
Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction
-
-
-
... More
(a) Single brick flat soling (thickness 75 mm.)
3120
-
380.08
... More
(g) Extra rate for using local sand inlieu of powered earth in Single layer soling
3120
-
4.52
... More
Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. A PCC Grade M20
1595.49
-
6900.53
... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
9240
-
27.15
... More
Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification.
475.2
-
1263.62
... More
NP2 300 mm dia Pipe with Collars delevered and stacked at site with initial distance of 30 km
16.8
-
746.59
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements