Irrigation And Waterways Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Eprocure
Opening Date8 Jun 2024
Closing Date28 Jun 2024
Tender Amount₹ 3,08,42,079
Costs
EMD
₹ 6,16,842Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbiw/se/mcc/nit-01(e)/2024-25 (2nd Call Of Wbiw/se/mcc/nit-01(e)/2023-24)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IWD_689573_1Bid Award Id
ViewTender No
WBIW/SE/MCC/NIT-01(e)/2024-25 (2nd Call of WBIW/SE/MCC/NIT-01(e)/2023-24)Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cutting uprooting and clearing jungles including shrubs, water weeds,bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge.
18000
107280
-
... More
Labour charges for collecting loose scattered laterite and stone boulders from slope, bed or apron and stacking the same above ground level within a lead of 100 metre and all lifts as per direction of the Engineer - in-charge
1701
415588
-
... More
Relaying displaced stone or laterite boulder pitching including dressing, preparing bed with necessary earthwork upto 30 cm depth complete with cost of collection of boulder within a lead of 30 metre.
1701
403426
-
... More
Turfing with chorkata or durba grass sods 5 cm. to 8 cm. thick in slope, crest berm etc. of embankments, canals and drainage channels etc. within a lead of 150 metre and all lifts including fine dressing, watering, ramming, guarding etc. complete. (sods will have to be arranged by the contractor at his own cost. Payment to be made on the grown grass only).
16088
536857
-
... More
Extra rate over item No. 7 for every additional lead of 75 metre or part thereof beyond the initial lead of 150 metre upto 750 metre.
7240
43150
-
... More
Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications. D) RCC Grade M20
(i) Height upto 5m.
60
419863
-
... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches
390
11154
-
... More
Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge.
4.71
340761
-
... More
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
(iii) 15 cm Avg. diameter
6000
1551720
-
... More
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
(i) 15 cm Avg. diameter.
4000
500560
-
... More
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage tosite. (a) Width of thinner end above 10 cm. and less than 15 cm. (i) Jhaw / Eucalyptus
600
74370
-
... More
Supply of stone / laterite boulders at site including cost of material, loading, unloading and carriage and including all incidental charges like Royalty,complete. (Royalty certificate in original from concerned authority are to be submitted along with the bill) a) Panchami source (Each weighing 20kg & above)
5819
12382192
-
... More
Labour charges for stacking unloaded boulder / shingles to make them convenient for measurement as per direction of the Engineer-in-charge. a) Boulder of size above 20 kg
5819
492404
-
... More
Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing / welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge.
1500
432630
-
... More
Testing of Geo-textile materials including UV Test from well eqipped laboratories like Jadavpur University, BITRA, CIPET etc.) (This item is applicable only for third party testing conducted by the Engineer-in-charge to assure the quality of the Geo-textile material)
1
75083
-
... More
Coal tarring with 5% pitch including cost of material and labour complete as per direction of Engineer in Charge. (b)Two coat.
2820
184851
-
... More
Supply of G.I wire netting of different mesh and made with different SWG G I wire at site as per direction of the Engineer-in-charge. b)Mesh size 125 mm x 125 mm with 10SWG wire
7533
852886
-
... More
Labour charges for laying boulder/ shingles in apron or within wire netting of sausage for slope pitching including carriage upto 30 metre and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge. I) Boulder
2138.4
598902
-
... More
Supplying Nyloncage netting1 metre x 1metre x1 metresize withknot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete.
2505.2
349325
-
... More
Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of150 m.and alllifts in river slopeor bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre X 1metre X 1metre.
(a) Where boats are not necessary.
2505.2
1248015
-
... More
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
28214
201730
-
... More
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling willnot beaccepted ) , andstacking withina lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
28214
235305
-
... More
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
28214
101006
-
... More
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of ,NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. A) Beyond 500 metre and upto 1.00 km
26233
7888001
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements