Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Civil And Construction
Eprocure
Opening Date15 Nov 2021
Closing Date22 Nov 2021
Tender Amount₹ 6,78,142
Costs
EMD
₹ 13,563Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbiw/ee/kidivision/e-nit -12(e)/2021-22 Sl 18
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_IWD_350654_18Bid Award Id
ViewTender No
WBIW/EE/KIDIVISION/e-NIT -12(e)/2021-22Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
iii) from 90 m to 120 m
208.75
-
40.72
... More
Extra rate over Item Nos 1 for all kinds of soil for every additional lift of 1.50 metre or part there of beyond the initial lift of 1.50 metre.
417
-
13.57
... More
Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,D) Beyond 0.500 km and upto 1.00 km
835
-
313.69
... More
Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length).
1486.8
-
32.8
... More
Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are necessary.
954.4
-
12.44
... More
Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.)
260
-
24.89
... More
Supplying to site empty cement polythene bags (capacity50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg)
3621
-
6.79
... More
Labour charges for filling empty cement gunny bag / polythene bag (capacity50kg) with all kinds of earth (wetordry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:-Volume of earth / sand filled bags should not be less than 0.028 cum / bag.
3621
-
7.92
... More
Dumping in position earth /sand filled gunny / poly bags (capacity50kg) within a lead of 30 metre inclusive of all lifts.
3621
-
3.39
... More
SUPPLY OF MATERIALS INCLUDING LOADING, UNLOADING, CARRIAGE AND STACKED AT SITE COMPLETE.silver sand
81.4
-
904.96
... More
SUPPLY OF MATERIALS INCLUDING LOADING, UNLOADING, CARRIAGE AND STACKED AT SITE COMPLETE. 1) Bricks 1st class kiln burnt
3248
-
9615.2
... More
Brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench (on both side of the edging) with spoils and ramming the same thoroughly complete as per direction. (a) Brick-on-edge edging (125 mm) depth. b) On end edging.
118
-
5221.62
... More
Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used)
(The item included the cost of obtaining local sand or powdered earth)
(a) Single brick flat soling (thickness 75 mm)
814
-
4054.22
... More
Labour for taking out old soling edging including removing debris (a) Single flat soling
814
-
1109.71
... More
Labour for taking out brick on edge (12.5Cm.) edging including removing debries to flank or berm, sorting out serviceable materials and stacking within a lead of 30 Metre.
118
-
751.12
... More
Loading, unloading and stacking by Manual Means. A. Loading in to trucks at the lifting point, unloading at destination, stacking properly in go downs or yard etc. as directed including carriage by head load up to a lead of 50.00 m at each of the two points. D )Bricks
49332
-
162.89
... More
Carriage of bricks over pucca road i)Upto 5km
49332
-
335.97
... More
ii) 5 km to 9 km
49332
-
117.64