Irrigation And Waterways Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date4 Nov 2021
Closing Date11 Nov 2021
Tender Amount₹ 7,58,629 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 15,173Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_IWD_349205_6Bid Award Id
ViewTender No
WBIW/EE/JID/e-NIT-05/21-22Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying, fitting, fixing end pieces for rectangular/square/circular sausages at the ends, with 10 SWG/8SWG GI wire net of different mesh sizes tying & sewing the same maintaining a lap length of 150mm all around with 12 SWG GI wire complete, including the cost of supply of wire netting, fitting etc, complete as per direction of the Engineer-in-charge.
a) Mesh size 150 mm X 150 mm with 10 SWG wire
152.1
-
105.2
... More
Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for laying boulder in apron or within wire netting of sausage for slope pitching and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge. (Quarry bed belongs to Forest Deptt Govt of W.B)N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee :Rs. 91.25 per Cum
(b) For Non-Forest area Royalty: Rs. 53.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . Comprising Boulder above 30kg each 60% + Boulder above 20kg each 40%
151.2
-
911.68
... More
Supply of G.I wire netting of different mesh and made with different SWG G I wire at site as per direction of the Engineer-in-charge. a) Mesh size 150 mm x 150 mm with 10 SWG wire
722.96
-
90.5
... More
Labour charges for constructing sausage crates with 8 Guage/ 10 Guage dia. G.I. wirenetting of different shapes and sizes in embankment, apron, slope etc. including binding with 12 S.W.G., G.I. wire and tied at required interval as per direction of Engineer-in-Charge (rate excludes cost of wirenet and laying of boulders but includes cost of binding wire).
151.2
-
210.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements