Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department - IWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date3 Sep 2021
Closing Date17 Sep 2021
Tender Amount₹ 14,60,760
Costs
EMD
₹ 29,215Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbiw/ee/mdd/e-nit-3 (e)/2021-22_1
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_IWD_342301_1Bid Award Id
ViewTender No
WBIW/EE/MDD/e-NIT-3 (e)/2021-22Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 15.0 cm av Diameter
30.5
-
118.78
... More
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 17.50 cm av Diameter
26
-
126.69
... More
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 20.0 cm av Diameter
43.8
-
134.61
... More
Best Seasoned wood work in shutters, posts, plates, rafters, battens, trusses, beams, purlins, bargas, wheel-guards, running boards, frames etc. including supplying at site, handling, hoisting, fitting & fixing in position excluding the cost of bolt and nuts only but including the cost of nails and screws with cost and carriage of all materials complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels) Hard wood (Mahua /Arjun / Tentul.etc or similar quality hard wood as approved by the EIC)
19.9
-
55540.79
... More
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
Width of thinner end above 10 cm.and less than 15.00 cm.
Jhaw / Eucalyptus.
272.9
-
117.64
... More
Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge.
Two Coat
968.72
-
62.22
... More
Supplying at site and fitting & fixing Mild Steel long nuts & bolts etc. complete as per the direction of the Engineer-in-charge.
426.41
-
85.97
... More
Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25cm. and rough dressing etc. complete as perprofile.
751.67
-
91.63
... More
Extra rate over Item Nos. 11 for all kind of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. from 30 to 60 m
198.61
-
13.57
... More
Extra rate over Item Nos. 11 for all kind of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. from 60 to 90 m
297.91
-
27.15
... More
Extra rate over Item Nos.11 for all kinds of soil for every
additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50 metre.
1 ( One ) additional lift.
496.52
-
13.57
... More
Supplying, dressing and stacking at site bamboo pins above 5 cm.diameter and upto 7.5 cm. diameter. Dia. to be measured at mid length.
360
-
32.8
... More
Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. Where boats are not necessary.
180
-
12.44
... More
Supplying, fitting and fixing with iron nails half split bamboo wailing pieces av. dia. of bamboo not less than 5.0 cm.
40
-
24.89
... More
Labour Charges for taking out old wood work including cutting bolts & nuts and stacking within a lead of 100 M etc. completeas per the direction of the Engineer -in-charge (Quantum should be corrected upto 3 decimals)
6.93
-
3082.52
... More
Taking out bullah wailing pieces after removing nuts, bolts and iron nails and stacking the same within 150 metre from the site of work including sorting out and stacking serviceable meterials.
42
-
10.18
... More
Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc
27.36
-
42.99
... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary On timber or plastered surface : With super gloss (hi-gloss) Two coats (with any shade except white)
27.36
-
91.63
... More
Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge.
400
-
5.66
... More
Labour charges for old or new wood work including hoisting ,fitting & fixing including supplying nails and screws whereever necessary etc.complete as per the direction of the EIC.(The quantam should be corrected upto 3 decimals)
2.54
-
7269.09
... More
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
494
-
6.79
... More
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a
lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
494
-
7.92
... More
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
494
-
3.39