Irrigation And Waterways Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Civil And Construction
Excavation
Eprocure
Opening Date25 Mar 2025
Closing Date15 Apr 2025
Tender Amount₹ 3,92,93,876
AI Insights
Technical
Technical
Financial
Additional Eligibility
Technical Capacity
... View More
The required prior work experience for the bidder includes similar previous works contracts. The bidder must have satisfactorily completed at least one work of 'similar in nature' under the Government Sector within the last five financial years. The value of single work/service of a similar nature completed includes:
- Rs. 3,39,70,976.00
- Rs. 2,34,27,958.00
- Rs. 93,29,710.00
- Rs. 62,43,078.00
- Rs. 6,35,58,317.00 The percentage of similar works completed includes:
- 25% of Tender BOQ or above (for Concrete work and Protection Work)
- 15%, 25%, 40%, 50%, 75%, 100% (mentioned in a table) Additionally, the bidder must have completed a work of a gross monetary value of Rs. 4,76,68,738.00, which is 30% of the Amount put to Tender.
Costs
EMD
₹ 7,85,878Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbiw/se/ec/nit-17(e)/2024-25 Sl-2
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_IWD_830898_2Tender No
WBIW/SE/EC/NIT-17(e)/2024-25Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. To be measured at mid length).
14179.2
41
588011
... More
Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
A) Where boats are not necessary.
8271.2
13
108435
... More
Supplying Nylon cage netting 1metre x 1metre x 1metre size with knot having mesh size 17.5 cm x17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250Kg./sq.cm.including carriage, delivery and stacking at site inclusive of all taxes complete).
3164
167
529432
... More
Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny/poly cement bags (minimum 25 nos. having capacity 50 kg ) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth/sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB: Volume of each earth/sand filled bags should not be less than 0.028 m3.
A) Size of Nylon crate is 1 metre x 1 metre x 1 metre. i) Where boats are not necessary).
3164
498
1576210
... More
Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing /welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge. Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top. 2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.7.7, 2.7.9 and 2.7.10 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification & Special Terms & Conditions for Geotextile” in case of use of this item in the estimate. 3. This particular item is to be used in special cases, either in continuation of previous usage or after offering adequate justification from techno-economical angles.
19424
346
6722646
... More
Pumping out water from ponds or tanks. (Payment if permitted will be made on the quantity of water calculated on the basis of initial water level and final level on consideration being made for any water that may have been added through percolation or otherwise)
29086.4
1244
361905
... More
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Note: The rate inclusive for compensation for earth for land owned / arranged by the contractor add Rs. 25.00 per cum and Royalty Charges on earth @29.00 per cum and cesses charges @ Rs. 5.30 Per Cum (i.e., Rs. 15.00 per 100 cft) , as per Govt. notification, which will be paid on production of necessary documents in support of payment made towards the royalties and cesses.
-
-
-
... More
Beyond 500m to 1.00 k.m.
31858.76
330
10528683
... More
Beyond 1.00km to 2.00 k.m.
31858.76
341
10870527
... More
Earth work from borrow pits over existing embankment or for repairs to embankment, closing breachesetc.within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile.
15929.38
96
1537822
... More
Extra rate over Item Nos. 11 for all kind of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.
-
-
-
... More
1 (One) No. additional lead.
7964.69
14
113895
... More
2 (Two) No. additional lead.
4778.81
28
136674
... More
3 (Three) No. additional lead
3185.88
42
136674
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%