Irrigation And Waterways Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Civil And Construction
Eprocure
Opening Date24 Oct 2024
Closing Date6 Nov 2024
Tender Amount₹ 4,91,242
Costs
EMD
₹ 9,825Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Restoration Of Slip, Subsidence, Erossion Of Left Bank Of Jamberia Khal For A Length Of 42.00 M Causing Heavy Discharge During 16/09/2024 To 18/09/2024 And Full Moon High Tide Water Flow In Word No-16 Of Uluberia Municipality, P.s-uluberia, Dist-how
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IWD_763918_5Bid Award Id
ViewTender No
WBIW/EEII/LDCD/e-NIT11/2024-25Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earthwork supplied by boat within a lead of 8.0 KM & all lifts for making embankments or for repairs to embankments, closing breaches or for any other purposes including loading, transporting, unloading and spreadingn in layers of 25 cms as per profile, all lifts bothways and head load including breaking clods, rough dressing ramming etc. complete as per direction of Engineer-in-charge.(measurement will be made on the basis of pre-work & post-work section / stack measurement with due allowance
of shrinkage). No extra payment will be made for stacking.
77.7
343
26670
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
2775
7
19841
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling willnot beaccepted ) , andstacking withina lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
2775
8
23144
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
2775
3
9935
Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knothaving mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210x 24) having tensile strength not less than 250 Kg. / sq. cm. includingcarriage, delivery and stacking at site inclusive of all taxes complete.
252
139
35139
Labour charges for dumping and placing in positionproperly filled inNylon crates with filled in gunny / poly cement bags (minimum 25 nos.having capacity 50 kg) with local earth or sand, sewing and tying thecrate with nylon wire within a lead of 150 m. and all lifts in river slope orbed by cutting trenches upto 50 cms depth, if necessary, or by boatincluding cost of hire charges of boat, boatmen and other necessaryequipments and also including cost of bags, carriage and charge offilling bags with earth / sand but excluding cost of nylon crate as perdirection of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than
0.028 m3.Size of Nylon crate is 1metre X 1metre X 1metre.
(a) Where boats are not necessary.
252
498
125539