Irrigation And Waterways Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Irrigation And Waterways Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date1 Dec 2021
Closing Date8 Dec 2021
Tender Amount₹ 8,41,808 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm depth, where necessary and compacting with wooden malllet after laying to achieve designed section as per direction of the Engineer- in - Charge (measurements will be on finished work / in stack after deducting necessary void).) 1st Class Brick ballast

78

-

2113.08

... More
Supplying to site and pitching with 1st class kiln burnt or picked Jhama bricks including dressing, ramming and preparing bed to proper slope complete with necessary earth work not exceeding 300 m.m. in depth and filling gaps with powdered earth or local sand etc. complete ( The rate is including cost of sand). With 1st class kiln burnt brick 20.00 cm thick

440

-

961.52

... More
Labour charges for relaying and replacing the displaced dry brick pitching by old bricks including dressing and preparing bed with necessary earth work upto 30 cm depth complete including filling gaps with powdered earth or local sand, including collection of bricks within a lead of 50 metre and finishing the same as per direction of the Engineer- in - Charge. 20.00 cm thick

80

-

141.4

... More
Making cubical bamboo porcupine cages with bamboo of 60 mm to75mm dia. having length of 1.8 metre each for all horizontal and vertical struts and 2.5 metre length for diagonal struts, 3nos horizontal and 3 nos vertical struts should be placed equi-distant from each face to make the square cage of outer dimension 60 cm x 60 cm and projecting each strut by 60 cm on all directions. Two nos dioganals or cross bamboo posts should be placed on each face having their centre tied with the centre of cage properly including fitting, fixing corners, vertical, horizontal and diagonal struts with iron nails not less than 20 cm long and tying corners with 16 SWG galvanized iron wires, filling the cages with 1st class kiln burn Brick @ 40 nos bricks per cage. Cages builts with 10 SWG hexagonal or square pattern 10 cm mesh, with proper lapping, tying and sewing with 10 SWG GI wire including cost of all materials, carriage to site and laying the same in the bed or slope of the river etc. complete as per direction of the Engineer - in - Charge ( N.B::- If G I wirenetting is not considered then Rs. 215.00 per cage may be deducted from the following costs, towards cost of wire netting including OH and conctarcor's profit .) For cages of size 60cm x 60cm x 60cm with 1st class kiln burn Bricks Single cage

75

-

3369.84



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.