Irrigation And Waterways Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Civil And Construction
Bridge Construction
Irrigation Work
Eprocure
Opening Date8 Oct 2024
Closing Date23 Oct 2024
Tender Amount₹ 6,18,291
Costs
EMD
₹ 12,366Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbiw/ee/kidivision/e-nit- 08 (e)/2024-25 Sl 17
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IWD_761823_17Bid Award Id
ViewTender No
WBIW/EE/KIDIVISION/e-NIT- 08 (e)/2024-25Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supplying at site and fitting & fixing Mild Steel long nuts & bolts etc. complete as per the direction of the Engineer-in-charge.
113.28
10261
90.58
Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge b)Two Coat
297.78
19519
65.55
Removing old paint from blistered painted surface of steel or other metal by chipping including scraping and cleaning and exposing the original surface.
219.46
12292
56.01
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
219.46
7585
34.56
Painting on steel or other metal surface with any approved bituminous anticorrosive paint after preparing the surface including removing paints, cleaning, smoothening etc. including scaffolding where necessary including cost of all materials complete.
a) Two Coat
219.46
14908
67.93
Welding in M.S. structural work with gas or electric: (b) Continuous weld
3974
42641
10.73
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.
(I) For structural members of specified sections weighing less than 22.5 Kg./m
1.73
149434
86528.26