Irrigation And Waterways Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Irrigation And Waterways Department Tender

Works
Civil And Construction
Civil Works Others
Excavation
Eprocure
Opening Date8 Oct 2024
Closing Date29 Oct 2024
Tender Amount₹ 12,63,56,884 
Notes
Download

Costs

Summary

"Construction of Sundarban embankment along river Raimangal from Ch. 2.65 k.m to Ch. 3.65 k.m for a total length of 1.00 k.m ackchara

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
A) Five extra lead.

15340.71

1097014

71.51

... More
Extra rate over Item Nos.1 for all kinds of soil for every additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50 metre. A) One extra lift.

15340.71

219372

14.3

... More
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile,levelling as per direction ofthe Engineer-in-charge within a lead of, NB : Measurement to be taken on the basis of stack measurement/prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Note: The rate is inclusive for compensation for earth for land owned and arranged by the contractor add Rs. 25.00 per cum extra over rate of E/W for land owned /arranged by the Department . Royalty charges on earth @ Rs. 29.00 per cum & cesses charges @ Rs. 5.30 per cum (i.e., Rs. 15.00 per 100 cft.), as per Govt. notification , which will be paid on production of necessary documents in support of payment made towrds the royalties & Cesses.

-

-

-

... More
Beyond 500 metre and upto 1.00 km.

21915.3

7242568

330.48

... More
Compacting earthwork in embankment in layers of 25 cm. by power roller or by any other mechanical means, like tractor driven sheep foot roller/ vibrating plate compactor earth rammer etc., (not at OMC) including necessary watering, labour charges, hire charges of all materials, tools & plants etc. and including cost and supply of all materials complete as per direction of the Engineer-in-charge. (Payment will be made on the basis of Pre-work & Post-work level).

21915.3

600698

27.41

... More
Earthwork in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils within a lead of 75 metre as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete.

-

-

-

... More
Depth of excavation not exceeding 1,500 mm.

11340.4

1611992

14214.6

... More
Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring.

2959.3

678504

22927.85

... More
Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary.

222.2

62153

27971.55

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). A) With earth obtained from excavation of foundation.

7260.95

671000

9241.22

... More
Making sausages Square or Rectangular in section (any length) made with 1st class kiln burnt / 1st class picked jhama full bricks rolled inside with 10 S.W.G. galvanised square pattern (internal dimension of mesh will be 100 m.m. x 100 m.m. square) galvanised wirenet caging with proper lapping of minimum 150 m.m, and sewing with 12 S.W.G. galvanisedwireincludingcostof allmaterials, carriage upto site, placing and laying the same in position, after preparing the bed to proper slope etc. complete as per direction of the Engineer-in-charge. (cost is excluding the cost of end pieces.). A) 0.90 metre x 0.90 metre nominal section

10

51143

5114.26

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. A) Pakur Variety.

810

6788294

8380.61

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) A) 25 mm to 30 mm shuttering without staging in foundation.

1908.54

582372

305.14

... More
Providing and laying pre-cast interlocked brick block pitching of required size (53 Cm. x 53 Cm, x 25 Cm. or as directed by the Engineer-in-charge ) with 100 mm protrusion in staggered manner with 1st class kiln burnt bricks in cement mortar including flush pointing on all faces except exposed face which to be plastered with 19 m.m. thick cement plaster , curing, dressing, ramming & preparing subgrade in slopes & bed complete with necessary earth work not exceeding 300 mm in depth with all leads & lifts including cost of all materials/ blocks up to site by all means of transport. The gap between adjacent blocks will not be more than 10 m.m. (Sand, cement mortar mix for making blocks, pointing & plastering is1:4).

1128.26

11041062

9785.92

... More
Providing and laying pre-cast interlocked brick block pitching of required size (53 Cm. x 53 Cm, x 25 Cm. or as directed by the Engineer-in-charge ) without any protrusion with 1st class kiln burnt bricks in cement mortar including flush pointing on all faces except exposed face which to be plastered with 19 m.m. thick cement plaster , curing, dressing, ramming & preparing subgrade in slopes & bed complete with necessary earth work not exceeding 300 mm in depth with all leads & lifts including cost of all materials/ blocks up to site by all means of transport. The gap between adjacent blocks will not be more than 10 m.m. (Sand, cement mortar mix for making blocks, pointing & plastering is1:4).

4528.12

41982963

9271.61

... More
Providing and laying pre-cast brick block pitching of required size (53 Cm. x 53 Cm, x 25 Cm. or as directed by the Engineer-in-charge ) with 1st class kiln burnt bricks in cement mortar including flush pointing on all faces except exposed face which to be plastered with 19 m.m. thick cement plaster , curing, dressing, ramming & preparing subgrade in slopes & bed complete with necessary earth work not exceeding 300 mm in depth with all leads & lifts including cost of all materials/ blocks up to site by all means of transport. The gap between adjacent blocks will not be more than 10 m.m. (Sand, cement mortar mix for making blocks, pointing & plastering is1:4).

488.98

4060250

8303.51

... More
Making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm depth, where necessary and compacting with wooden malllet after laying to achieve designed section as per direction of the Engineer- in - Charge (measurements will be on finished work / in stack after deducting necessary void). A) 1st class brick ballast.

3334.44

8908090

2671.54

... More
First class Brick work in cement sand mortar in steining of well, pier, abutment, wing wall, parapets cross drain. H.P. culverts, guard wall etc. including curing, scaffolding, raking out joints etc. complete including cost and carriage of all materials. A) In 1:4 proportion.

47.8

382085

7993.42

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] A) With 1:4 cement mortar; i) 15 mm thick plaster.

3405.65

811532

238.29

... More
Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. A) Soling or dry pavement with one brick on-edge laid in herring bone pattern over a layer of brick flat (thickness 125 mm plus 75 mm).

2618.2

3409629

1302.28

... More
Supplying, testing and installation of open Weave Jute Geotextile (JGT) having overall weight of 500 gm/sq. m, thickness 6 mm, width 1220 mm, Tensile strength 10 KN/m (Warp direction) × 7.50 KN/m (weft direction) on slopes of embankments dressed and cut to a gradient as per design and drawing for control of surface soil erosion on proposed bank slope of embankment including the cost of preparation of sub- grade and excavating the trenches of 500 mm deep and spade-width wide where necessary, and filling the trenches with earth duly secured to sub-grade by U shape MS staples (11 gauges) or wooden or plastic pegs at an interval of 450 mm, providing side lapping of 100 mm and horizontal lapping of 300 mm as per direction complete. The rate is inclusive of all incidental charges, transportation by all means to the work site, all leads and lifts complete. (Payment will made on the basis of finished surface area of the slope).

20200.8

1675656

82.95

... More
Turfing with chorkata or durba grasssods 5cm.to 8cm.thick in slope,crest berm etc.of embankments, canals and drainage channels etc.within a lead of 150 metre and alllifts including fine dressing, watering, ramming, guarding etc. complete.(sods will have to be arranged by the contractor at his own cost.Payment to be made on the growngrass only).

14837.2

495117

33.37

... More
Supplying Jhaw/Eucalyptus bullah piles at work site, including dressing and making one end pointed. Note: Diameter of pile to be measured at a distance of 1.5 m. from the thicker end. A) 15.0 cm. av. diameter.

10788

3347948

310.34

... More
Labour for driving Jhaw/Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. A) 15.0 cm. av. diameter. Note: 1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end.

8642.1

1081472

125.14

... More
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site. A) Width of thinner end above 10 cm. and less than 15 cm; i) Jhaw / Eucalyptus.

2425

360670

148.73

... More
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).

4107

35279

8.59

... More
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.

4107

34252

8.34

... More
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.

4107

14703

3.58

... More
Making cubical bamboo porcupine cages with bamboo of 60 mm to 75mm dia. having length of 2 metre each for all horizontal and vertical struts and 2.8 metre length for diagonal struts, 3 nos horizontal and 3 nos vertical struts should be placed equi-distant from each face to make the square cage of outer dimension 75 cm x 75 cm and projecting each strut by 60 cm on all directions. Two nos dioganals or cross bamboo posts should be placed on each face having their centre tied with the centre of cage properly including fitting, fixing corners, vertical, horizontal and diagonal struts with iron nails not less than 20 cm long and tying corners with 16 SWG galvanized iron wire, filling the cages with 1st class kiln burn Brick @ 80 nos bricks per cage. Cages builts with 10 SWG hexagonal or square pattern 10 cm mesh, with proper lapping, tying and sewing with 10 SWG GI wire including cost of all materials, carriage to site and laying the same in the bed or slope of the river complete as per direction of the Engineer - in - Charge ( N.B::- If G I wirenetting is not considered then Rs. 348.00 per cage may be deducted from the following costs, towards cost of wire netting including OH and conctarcor's profit.) For cages of size 75cm x 75cm x 75cm with 1st class kiln burn Bricks A) Single cage.

4288

22776184

5311.61

... More
Extra rate for item No. 26 above for dumping by boat in flowing water including cost of hiring of boat, boatman, loading into boat and dumping in specified location including all other equipments etc. complete as per direction of the Engineer-in charge.

4288

419066

97.73

... More
Supplying at site to following materials including carrage overhead charges and contractor profit. A) 10 SWG GI Wire.

11.61

101534

8745.43



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.