Irrigation And Waterways Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Irrigation And Waterways Department Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date7 Oct 2021
Closing Date1 Nov 2021
Tender Amount₹ 29,79,963 
Notes
Download

Costs

Summary

Wbiw/ee/kidivision/e-nit -10(e)/2021-22 Sl 15

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour for fitting, fixing with iron nails half split bullahwailing piecesand cross pieces etc. complete including cost of nails only complete as per direction of the Engineer-In-charge. Jhaw / Eucalyptus a) Width of thinner end above 15 cm

220

-

18.1

... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m

4.89

-

66875.41

... More
Welding in M.S. structural work with gas or electric: (b) Continuous weld

28191.52

-

10.18

... More
Removing old paint from blistered painted surface with application of soda, sajimati or any approved chemical paint remover and exposing the original surface including cleaning and thorough washing to remove all traces of the removing agent including taking out shutters and refixing the same where necessary

2656.42

-

44.12

... More
(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc

2923.92

-

32.8

... More
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface : With other than hi-gloss of approved quality (iv) Two coats (with any shade except white)

2923.92

-

81.45

... More
Best Seasoned wood work in shutters, posts, plates, rafters, battens, trusses, beams, purlins, bargas, wheel-guards, running boards, frames etc. including supplying at site, handling, hoisting, fitting & fixing in position excluding the cost of bolt and nuts only but including the cost of nails and screws with cost and carriage of all materials complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels) (a) Sal wood

2.07

-

105369.02

... More
Labour charges for old or new wood work including hoisting, fitting & fixing including supplying new nails and screws wherever necessary etc. complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels)

34.54

-

7269.09

... More
Supplying at site and fitting & fixing Mild Steel long nuts & bolts etc. complete as per the direction of the Engineer-in-charge.

209.78

-

85.97

... More
Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge b)Two Coat

963.19

-

62.22

... More
Loading, unloading and stacking by Manual Means. A. Loading in to trucks at the lifting point, unloading at destination, stacking properly in go downs or yard etc. as directed including carriage by head load up to a lead of 50.00 m at each of the two points. (a) Lime, Moorum, Building rubbish and similar miscellaneous materials

45.81

-

70.13

... More
(h) Steel

35.79

-

108.6

... More
Road Tansportation and Carriage Work Carriage of Cement (in bags), tar or asphalt (in drums), timber and similar miscellaneous materials over pucca road Distance carriage upto 5.0Km

45.81

-

92.76

... More
Extra rate over Item No-16 for carriage beyond 5 km up to 9 km

45.81

-

33.03

... More
Road Tansportation and Carriage Work. Carriage of Steel materials over pucca road. Distance carriage upto 5.0Km

35.79

-

92.76

... More
Extra rate over Item No-16 for carriage beyond 5 km up to 9 km

35.79

-

33.03

... More
Installationof M.S steel Gangway including repairing and replacement of steel members.if necessary (excluding the cost of steel members) drilling, necessary holes, wealding (renewing of fresh12 mm) tightenning with bolts and nuts, if requred, supply of HYFG bolts of G.K.W made of requredsize with necessary washers (tightening to be cheacked with calibrated taught wrench) cleats, stiffeners,gusset plates including hoisting, erecting, fitting, fixing and assembling the Gangway with all labours,and materials etc. Complete with cost of red lead painting of approved brand after cleaning the surfaceproperly, placing the gangway properly to pontoon and fixed to yoke including fitting the yoke withall accessories with all scaffolding and providing all such facilities to execute and complete the workas per direction of Engineer-in-Charge.

15.45

-

30990.54

... More
Labour Charge for lifting and dismainting gangway & accessaries including removing bolts and nuts without damaging the same including lubricating the same for preservation to godown including cutting welding without carriage the steel members with neccessary scaffolding and machineries for lifting the gangway the all including chargs as per direction of the Engineer in Charge.

15.45

-

26414.11

... More
Labour charges for taking out old wood work including cutting bolts and nuts and stacking within a lead of 100 metre etc. complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels)

36.35

-

3082.52

... More
Taking out Jhaw / Eucalyptus piles from river bed or from elsewhere including carrying, stacking materials in the nearest stack yard. (a) Up to 17.5 cm. diameter

188.4

-

13.35

... More
Taking out bullah wailing piecesafter removingnuts, boltsand iron nails and stacking the same within 150 metre from the site of work including sorting out and stacking serviceable meterials.

220

-

10.18

... More
Supply of material to site 1st Class Bricks (kiln burnt) Stored and Stacked at site

1376

-

9157.06

... More
Brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench (on both side of the edging) with spoils and ramming the same thoroughly complete as per direction. (a) Brick-on-endedging (250 mm) depth.

28

-

10082.39

... More
Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used)(The item included the cost of obtaining local sand or powdered earth)(b) Double brick flat soling (thickness 75 mm. plus 75 mm)

41

-

6081.33

... More
Loading, unloading and stacking by Manual Means. A. Loading in to trucks at the lifting point, unloading at destination, stacking properly in go downs or yard etc. as directed including carriage by head load up to a lead of 50.00 m at each of the two points.

26374

-

162.89

... More
Road Tansportation and Carriage Work. Carriage of Brick over pucca road Distance carriage upto 5.0Km

26374

-

335.97

... More
Extra rate over Item No-26 for carriage beyond 5 km up to 9 km

26374

-

117.64

... More
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).

2804

-

6.79

... More
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling willnot beaccepted ) , andstacking withina lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.

2804

-

7.92

... More
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.

2804

-

3.39

... More
Supply of Materials including loading, unloading, carriage and Stacked at site complete.River sand local

49

-

904.96

... More
Fitting, fixing bitumen drum sheet to bullah piling and wailing pieces including cutting straightening drum sheet fixing with country nails @ 20cm c/c at top & bottom and bolts& nuts at top & bottom at every joint of drum sheet with a laping of 15 cm, including supply of drum sheet, fixture all complete as per direction of the Engineer - in - charge.

64

-

494.33

... More
Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile.

315

-

91.63

... More
Extra rate over Item Nos.32 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.1(One) addl. lead

63

-

13.57

... More
2(Two) addl. Lead

31.5

-

27.15

... More
Extra rate over Item Nos.32 for all kinds of soil for every additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50 metre.

63

-

13.57

... More
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile,levellingasper direction ofthe Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.

315

-

276.01

... More
Labour for taking out old soling edging including removing debris.(b) Double flat soling

41

-

1632.32

... More
Labour for taking out brick-on-end edging including removing debris to flank or berm sorting out serviceable materials and stacking.

28

-

751.12



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.