Irrigation And Waterways Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Irrigation And Waterways Department Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date7 Oct 2021
Closing Date1 Nov 2021
Tender Amount₹ 37,10,919 
Notes
Download

Costs

Summary

Wbiw/ee/kidivision/e-nit -10(e)/2021-22 Sl 5

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Welding iron M.S. structural works by gas or elctric b) continous welding

58122

-

13.23

... More
Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge b) Two Coat

753

-

74.66

... More
Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length).

2513

-

39.37

... More
Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary

1391.4

-

12.44

... More
Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.)

440

-

29.87

... More
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).

5893

-

8.14

... More
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag

5893

-

7.92

... More
Extra rate for item no above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre. i) Two extra lead

5893

-

6.79

... More
Dumping in position earth filled gunny or polythin bags with lead of 30M with all lifts.

5893

-

3.39

... More
Best Seasoned wood work in shutters, posts, plates, rafters, battens, trusses, beams, purlins, bargas, wheel-guards, running boards, frames etc. including supplying at site, handling, hoisting, fitting & fixing in position excluding the cost of bolt and nuts only but including the cost of nails and screws with cost and carriage of all materials complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels) (a) Sal wood

8.75

-

126442.82

... More
Labour charges for old or new wood work including hoisting, fitting & fixing including supplying new nails and screws wherever necessary etc. complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels)

20.41

-

7269.09

... More
Removing old paint from blistered painted surface of steel or other metal by chipping including scraping and cleaning and exposing the original surface

1517

-

69.11

... More
Painting on steel or other metal surface with any approved bituminous anticorrosive paint after preparing the surface including removing paints, cleaning, smoothening etc. including scaffolding where necessary including cost of all materials complete. b) Two Coat

974.83

-

77.38

... More
(b) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

542.65

-

42.64

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface : With other than hi-gloss of approved quality (iv) Two coats (with any shade except white)

542.65

-

105.88

... More
Labour for taking out old wood works including bolts nuts & stacking with in a lead of 100 m ect. Complete as per the direction of EIC

29.16

-

3082.52

... More
Supply of materials including, loading, unloading, carriage & stacked at site …................etc. complete. A) Materials delivered & stacked at site. Silver sand

56

-

1085.95

... More
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary a) depth up to 150 mm

227.5

-

19.54

... More
a) depthabove 150 mm & up to 300 mm

227.5

-

25.8

... More
Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction (d) Soling or dry pavement with one brick-on-edge laid in herring bone pattern over a layer of brick flat (thickness 125 mm plus 75 mm)

77

-

1311.74

... More
Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used) (d) Soling or dry pavement with one brick-on-edge laid in herring bone pattern on a layer of brick flat (thickness 75 mm. plus 125 mm)

180

-

10780.68

... More
Earth work from borrow pits over existing embankment or for repairs to embankment, closing breachesetc.within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile.

1510

-

91.63

... More
Extra rate over Item Nos. 27 for all kind of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. i) from 60m to 90 m

755

-

27.15

... More
ii) from90m to 120m

755

-

40.72

... More
Extra rate over Item Nos for all kinds of soil for every additional lift of 1.50 metre or part there of beyond the initial lift of 1.50 metre

1510

-

13.57

... More
Labour for taking out old brick-on-edge edging including removing debris to flank or berm sorting out serviceable materials and stacking. A) single flat soling

400

-

1109.71

... More
Labour for taking out brick-on-end edging including removing debris to flank or berm sorting out serviceable materials and stacking.

40

-

751.12

... More
Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per Technical Specifications Clause 202 for Rural Roads of MORD (a) Including dismembering

5.18

-

1403.82

... More
Loading, unloading and stacking by Manual Means. A. Loading in to trucks at the lifting point, unloading at destination, stacking properly in go downs or yard etc. as directed including carriage by head load up to a lead of 50.00 m at each of the two points (h) Stee

5.18

-

108.6

... More
Carriage of Steel materials over pucca road.

5.18

-

92.76



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.