Irrigation And Waterways Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Irrigation And Waterways Department - IWD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Sep 2021
Closing Date23 Sep 2021
Tender Amount₹ 19,43,339 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Wbiw/ee-i/ldid/e-nit- 08 /2021-22 Sl-27

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.

10

-

6332.55

... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (a) Where staging is not required.

69

-

242.08

... More
Cost of stone / laterite boulder at quarry site including Royalty (Royalty certificate in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty of stone / laterite boulder will be deducted from the bills of works) . a) Laterite Boulder (Each weighing 20 kg & upto 40 kg) Following rates of royalty are to be considered till further modification of prevailing rates by the Department of Industry, Commerce & Enterprises, Govt. of West Bengal for Pachamil sourced stone boulder and laterite boulderand by the Department of Mines & Geology, Government of Jharkhand for stone boulder of Pakur variety a) Panchami source : Rs. 53 per Cum b) Pakur source : Rs.105 per Cum c) laterite boulder : Rs. 36 per Cum

335

-

2276.22

... More
Labour charges for bouIder pitching on top and slope by placing required boulders (each weighing 20 Kg. and above within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub-grade by cutting or filling the earth on slope upto 7.5 cm. depth, watering and ramming where necessary complete as per direction of the Engineer-in-charge. a) Over Jhama Khoa / metal filter/ Geo-textile filter.

207

-

566.73

... More
Supplying at site and laying in position UV stabilized needle punched, stapled fibre / continuous filament polypropylene non-woven geotextile of 300 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing / welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge. Note : 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top. 2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.7.7, 2.7.9 and 2.7.10 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification and Special Terms & Conditions for Geotextile” in case of use of this item in the estimate.

1209

-

220.58

... More
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile,levellingasper direction ofthe Engineer-in-charge within a lead of. NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. ( NOTE: For compensation for earth for land owned and arranged by Contractor add @ Rs.25.00 per m³ extra over rate of E/W for land owned / arranged by the Department & for royalty charge on earth @ Rs.29.00 per m³ and Cess Charges @ Rs.5.30 per m³ as per Govt. notification which will be paid on production of necessary documents in support of payment made towards the royalties & Cess.) A) Beyond 500 metre and upto 1.00 km

347

-

313.69

... More
Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. x 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump agreegates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces) a) 0.90 metre x 0.60 metre nominal section

96

-

511.3

... More
b) 0.75 metre x 0.45 metre nominal section

226

-

390.26

... More
Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting,fitting etc, complete as per direction of the Engineer - in - charge. a) Mesh size 125 mm x 125 mm with 10 SWG wire

18

-

122.17

... More
Supplying to site and pitching with 1st class kiln burnt or picked Jhama bricks including dressing, ramming and preparing bed to proper slope complete with necessary earth work not exceeding 300 m.m. in depth and filling gaps with powdered earth or local sand etc. complete ( The rate is including cost of sand). i) With 1st class kiln burnt brick a) 20.00 cm thick

38.5

-

9614.07

... More
Labour charges for relaying and replacing the displaced dry brick pitching by old bricks including dressing and preparing bed with necessary earth work upto 30 cm depth complete including filling gaps with powdered earth or local sand, including collection of bricks within a lead of 50 metre and finishing the same as per direction of the Engineer - in - Charge. c) 20.00 cm thick

115.5

-

141.4

... More
Caulking joints of laterite / stone boulder or Brick pitching with cement mortar 1:4 and flush pointing as per direction of the Engineer-in-charge. (a) Brick pitching.

154

-

88.23



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.