Irrigation And Waterways Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Oct 2021
Closing Date14 Oct 2021
Tender Amount₹ 2,15,76,729 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 4,19,903Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_IWD_347133_3Bid Award Id
ViewTender No
WBIW/SE/MCC/SNIT-01(e)/2021-22Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile.
1997.28
-
91.63
... More
Extra rate over Item No.2 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.
one additional lead.
499.32
-
13.57
... More
Two additional lead.
599.18
-
27.15
... More
Three additional lead.
399.46
-
40.72
... More
Turfing with chorkata or durba grass sods 5 cm. to 8 cm. thick in slope,crest berm etc. of embankments, canals and drainage channels etc.within a lead of 150 metre and all lifts including fine dressing, watering,ramming, guarding etc. complete. (sods will have to be arranged by the contractor at his own cost. Payment to be made on the grown grass only).
4026
-
31.67
... More
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
v) 20.00 cm. average dia. Note: Diameter of pile to be measured at a distance of 1.5m from the
thicker end.
12562.5
-
345.02
... More
iii) 15.00 cm. average dia. Note: Diameter of pile to be measured at a distance of 1.5m from the
thicker end.
7755
-
245.47
... More
Supplying, fitting and fixing M.S iron shoe to Jhaw / Eucalyptus bullah piles including necessary cleats, nails etc. complete. a) For bullahs above 10 cm & up to 20 cm av. Diameter.
2557.5
-
203.62
... More
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
v) 20.00 cm. dia bullah.
5467.5
-
134.61
... More
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
iii) 15.00 cm. dia bullah.
2590
-
118.78
... More
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm. and less than 15 cm.
(i) Jhaw / Eucalyptus.
8580
-
117.64
... More
Splicing (as per drawing and direction of the Engineer-in-charge) in position 150 mm. to 250 mm. dia. of individual bullah with 2 Nos. 1250 mm. x 75 mm. x 10 mm. M.S. flat and 4 Nos. half rings made of(700 x 75 x 6) mm. M.S. flat fitted and fixed with 4 Nos. 12 mm. dia. bolts with nuts and washers. Flat bars are to be fitted and fixed with 3 Nos. 20 mm. dia. through bolts with nuts and washers including cost of supply and carriage of all materials, making necessary scaffolding, stagging etc. drilling holes complete (splicing is to be done on position after the bottom bullah is driven as per necessity). Length of lap of bullah should be provided as five times the diameter of bullah or 90 cm. whichever is greater.
862.5
-
3094.96
... More
Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete.
2632.5
-
132.35
... More
Labour charges for dumping and placing in position properly filled in
Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than
0.028 m3. Size of Nylon crate is 1metre X 1metre X 1metre.
(a) Where boats are not necessary.
2632.5
-
472.84
... More
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
64350
-
6.79
... More
Labour charges for filling empty cement gunny bag / polythene bag(capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
64350
-
7.92
... More
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
64350
-
3.39
... More
Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge.
b) Two Coat.
14661.23
-
62.22
... More
Pumping out water from ponds or tanks (Payment if permitted will be made on the quantity of water calculated on the basis of initial water level and final level on consideration being made for any water that may have been added through percolation or otherwise).
63360
-
1180.97
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements