Irrigation And Waterways Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Irrigation And Waterways Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date27 Aug 2024
Closing Date11 Sep 2024
Tender Amount₹ 12,34,098 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour charges for boulder pitching on top and slope by placing required boulders (each weighing 25 Kg and above within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub -grade by cutting or filling the earth on slope up to 7.5 cm. depth, watering and ramming where necessary complete as per direction of the Engineer-in charge. Over Jhama Khoa / metal filter /Geo-textile filter.

54

32243

597.09

... More
Quarrying carrying, Supplying stone boulders/shingles from the Eigineer-in charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all inciental charges like Royalty and labour charges for boulder pitching on top and slope by pitching required boulders(Boulder above 20 Kg each within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub-grade by cutting or filling the earth on slope up to 7.5cm. depth, watering and rarring where necessary complete but excluding the cost of singles of filling materials as per direction of the Engineer-in-charge.(Quarry belongs to Forest Deptt Govt of W.B)N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 91.25 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .a) Boulder above 20Kg each .

81

159770

1972.47

... More
Quarrying carrying, Supplying shingles from the Eigineer-in charge selected quarrying site to the site of work including cost of material, loading, unloading, stacking and carriage including all inciental charges like Royalty and labour charges for providing filter with well graded 40 mm. down shingles and laying uniformly below pitching on bed, side slopes including preparing bed with earth work upto 30 cm depth, where necessary and compacting as per direction of the Engineer-in-charge and including allleads and lifts complete. (Quarry belongs toL. & L.R Deptt Govt of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 53.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works. Shingles for slope

38

46194

1215.64

... More
Quarrying carrying, Supplying Stone boulders/ shingles from the Eigineer-in charge selected quarrying site to the site of work including cost of material, loading, unloading, stacking and carriage and including all inciental charges like Royalty.(Quarry belongs toL. & L.R Deptt Govt of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 91.25 per Cum (b) For Non-Forest area Royalty : Rs. 53.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .i) Shingles for interstics

21

16518

786.59

... More
Quarrying carrying, Supplying stone boulders/shingles from the Eigineer-in charge selected quarrying site to the site of work including cost of material, loading, unloading,staking and carriage including all inciental charges like Royalty and Labour charge for dumping / laying of Laterite / Stone Boulders 25 kg & above / Shingles / Brick Bats, from stack of worksite with all leads and lifts in water or in the River/ Sea bed to an uniform thickness as per direction of the Engineer-in-charge including cost of all accessories and other incidental charges.(Quarry belongs to Forest Deptt Govt of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum ( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .Comprising Boulder above 30Kg each @ 60% , Boulder above 20Kg each @ 30% & Boulder above 10Kg each @ 10%.

243

418694

1723.02

... More
Quarrying carrying, Supplying Stone boulders/ shingles from the Eigineer-in charge selected quarrying site to the site of work including cost of material, loading, unloading, stacking and carriage and including all incidental charges like Royalty and labour charges etc. complete as per direction of Engineer-in-charge. (Quarry belongs to Forest Deptt. Govt of W.B) N.B. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works. a)Comprising Boulder above 30Kg each @ 60% , Boulder above 20Kg each @ 30% & Boulder above 10Kg each @ 10%.

241

339738

1409.7

... More
Making rectangular / circular sausage cage with 10 SWG galvanized iron wire of 150 mm. x 150 mm. mesh wire netting with proper lapping of minimum 150 mm including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lumpaggregatescomplete as per direction of the Engineer-in-charge but excluding thecost of boulder / lump aggregates and its carriage upto site.(Cost isexcluding the cost of end pieces) 1.50 metre diameter.

160

160560

1003.5

... More
Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting,fitting etc, complete as per direction of the Engineer - in - charge. Mesh size 150 mm x 150 mm with 10 SWG wire

72

7980

110.84

... More
Extra rate over item no2.22 for carrying boulder by head load for each additional lead of 50 meter or part thereof beyond initial distance of 50 meter, upto a distance of 200 metre.

484

16151

33.37



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.