Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Irrigation And Waterways Department Tender

Works
Eprocure
Opening Date17 Jun 2021
Closing Date24 Jun 2021
Tender Amount₹ 4,45,719 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Wbiw/ee/apd/nit-02(e)/21-22 (sl 03)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying,fittingandfixingwithironnailshalfsplitbamboowailingpieces (av. dia. of bamboo not less than 5.0 cm.)

308

-

24.89

... More
Supplyingtositeemptycementpolythenebags(capacity50kg)ingoodconditionincludingstacking,incedentalchargesetc.allcomplete(capacity 50 kg).

1179

-

6.79

... More
Labourchargesforfillingemptycementgunnybag/polythenebag(capacity50kg)withallkindsofearth(wetordry),sandoragreegates(stone/brick)andsewingasdoneincaseofcementbags,(tyingwithaknotafterfillingwillnotbeaccepted),andstackingwithinaleadof30metreasperdirectionofEngr-in-charge(costisexcludingthe cost of any types of filling materials).NB:-Volumeofearth/sandfilledbagsshouldnotbelessthan0.028cum

1179

-

7.92

... More
Dumpinginpositionearth/sandfilledgunny/polybags(capacity50kg) within a lead of 30 metre inclusive of all lifts.

1179

-

3.39

... More
Makingcubicalbambooporcupinecageswithbambooof60mmto75mmdia.havinglengthof2metreeachforallhorizontalandverticalstrutsand2.8metrelengthfordiagonalstruts,3noshorizontaland3nosverticalstrutsshouldbeplacedequi-distantfromeachfacetomakethesquarecageofouterdimension75cmx75cmandprojectingeachstrutby60cmonalldirections.Twonosdioganalsorcrossbamboopostsshouldbeplacedoneachfacehavingtheircentretiedwiththecentreofcageproperlyincludingfitting,fixingcorners,vertical,horizontalanddiagonalstrutswithironnailsnotlessthan20cmlongandtyingcornerswith16SWGgalvanizedironwire,fillinginthecageswithboulders/lumpaggregates.Cagesbuiltswith10SWGhexagonalorsquarepattern10cmmesh,withproperlapping,tyingandsewingwith10SWGGIwireincludingcostofallmaterials,carriagetositeandlayingthesameinthebedorslopeoftheriver,fillingthesamewiththefillermaterialscompleteasperdirectionoftheEngineer-in-Chargebut excluding the cost & carriage of boulder / lump aggregate up to site.(N.B::-IfGIwirenettingisnotconsideredthenRs.348.00percagemaybedeductedfromthefollowingcosts,towardscostofwirenettingincluding OH and conctarcor's profits.)

-

-

-

... More
For cages of size 75cm x 75cm x 75cm with boulder. (Single cage.)

100

-

3011.25

... More
Quarrying ,Carrying ,Supplying stone boulders/shingles from the Engineer in Charge selected quarrying site to the site of work including cost of materials, loading, unloading, carriage and stacking including all incidental charges like Royalty inclusive of labour charges for laying boulder in apron as per direction of the Engineer In Charge. (Quarry bed belongs to Forest Dept. Govt. Of WB)

-

-

-

... More
Boulder 70% above 30kg and 20% above 20kg each. N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 91.25 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .

36

-

1279.89

... More
Quarrying , Carrying , Supplying shingles/Bed materials from the Engineer in Charge selected quarrying site to the site of work including cost of materials, loading, unloading , stacking and carriage including all incidental charges like Royalty and labour charges for laying uniformly where necessary and compacting as per direction of the Engineer In Charge and including all leads and lifts complete.. (Quarry bed belongs to L & LR Dept. , Govt. Of WB)

-

-

-

... More
Sand/Bed materials. N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (b) For Non-Forest area Royalty : Rs. 53.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .

33

-

528.72



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.