Irrigation And Waterways Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Eprocure
Opening Date17 Jun 2021
Closing Date24 Jun 2021
Tender Amount₹ 4,45,719 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 8,914Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbiw/ee/apd/nit-02(e)/21-22 (sl 03)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_IWD_333151_3Bid Award Id
ViewTender No
WBIW/EE/APD/NIT-02(e)/2021-22Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supplying,fittingandfixingwithironnailshalfsplitbamboowailingpieces (av. dia. of bamboo not less than 5.0 cm.)
308
-
24.89
Supplyingtositeemptycementpolythenebags(capacity50kg)ingoodconditionincludingstacking,incedentalchargesetc.allcomplete(capacity 50 kg).
1179
-
6.79
Labourchargesforfillingemptycementgunnybag/polythenebag(capacity50kg)withallkindsofearth(wetordry),sandoragreegates(stone/brick)andsewingasdoneincaseofcementbags,(tyingwithaknotafterfillingwillnotbeaccepted),andstackingwithinaleadof30metreasperdirectionofEngr-in-charge(costisexcludingthe cost of any types of filling materials).NB:-Volumeofearth/sandfilledbagsshouldnotbelessthan0.028cum
1179
-
7.92
Dumpinginpositionearth/sandfilledgunny/polybags(capacity50kg) within a lead of 30 metre inclusive of all lifts.
1179
-
3.39
Makingcubicalbambooporcupinecageswithbambooof60mmto75mmdia.havinglengthof2metreeachforallhorizontalandverticalstrutsand2.8metrelengthfordiagonalstruts,3noshorizontaland3nosverticalstrutsshouldbeplacedequi-distantfromeachfacetomakethesquarecageofouterdimension75cmx75cmandprojectingeachstrutby60cmonalldirections.Twonosdioganalsorcrossbamboopostsshouldbeplacedoneachfacehavingtheircentretiedwiththecentreofcageproperlyincludingfitting,fixingcorners,vertical,horizontalanddiagonalstrutswithironnailsnotlessthan20cmlongandtyingcornerswith16SWGgalvanizedironwire,fillinginthecageswithboulders/lumpaggregates.Cagesbuiltswith10SWGhexagonalorsquarepattern10cmmesh,withproperlapping,tyingandsewingwith10SWGGIwireincludingcostofallmaterials,carriagetositeandlayingthesameinthebedorslopeoftheriver,fillingthesamewiththefillermaterialscompleteasperdirectionoftheEngineer-in-Chargebut excluding the cost & carriage of boulder / lump aggregate up to site.(N.B::-IfGIwirenettingisnotconsideredthenRs.348.00percagemaybedeductedfromthefollowingcosts,towardscostofwirenettingincluding OH and conctarcor's profits.)
-
-
-
For cages of size 75cm x 75cm x 75cm with boulder. (Single cage.)
100
-
3011.25
Quarrying ,Carrying ,Supplying stone boulders/shingles from the Engineer in Charge selected quarrying site to the site of work including cost of materials, loading, unloading, carriage and stacking including all incidental charges like Royalty inclusive of labour charges for laying boulder in apron as per direction of the Engineer In Charge. (Quarry bed belongs to Forest Dept. Govt. Of WB)
-
-
-
Boulder 70% above 30kg and 20% above 20kg each. N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 91.25 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
36
-
1279.89
Quarrying , Carrying , Supplying shingles/Bed materials from the Engineer in Charge selected quarrying site to the site of work including cost of materials, loading, unloading , stacking and carriage including all incidental charges like Royalty and labour charges for laying uniformly where necessary and compacting as per direction of the Engineer In Charge and including all leads and lifts complete.. (Quarry bed belongs to L & LR Dept. , Govt. Of WB)
-
-
-
Sand/Bed materials. N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (b) For Non-Forest area Royalty : Rs. 53.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
33
-
528.72
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements