Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Sep 2021
Closing Date13 Sep 2021
Tender Amount₹ 27,60,523 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 55,210Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbiw/ee/wmd/e-nit- 07e/2021-22, Sl-04
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_IWD_342905_4Bid Award Id
ViewTender No
WBIW/EE/WMD/e-NIT- 07e/2021-22Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
Note: For string staging under specific instruction of Engineer-in-charge or for driving from pontoon or boats, the rate will be enhanced by ` 4.00 per meter.
-
-
-
... More
17.5 cm. av. diametre.
2406
-
126.69
... More
15 cm. av. diametre.
1005
-
118.78
... More
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
Width of thinner end above 15 cm. Jhaw / Eucalyptus.
1103
-
217.19
... More
Coal tarring with 5% pitch including cost of material and labourcomplete as per direction of the Engineer-in-charge.
One coats.
2540.84
-
32.8
... More
Supplying Nyloncage netting1 metre x 1metre x1 metresize withknot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete.
400
-
132.35
... More
Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of150 m.and alllifts in river slopeor bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre X 1metre X 1metre.
a) Where boats are not necessary.
400
-
472.84
... More
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
7286
-
6.79
... More
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling willnot beaccepted ) , andstacking withina lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
7286
-
7.92
... More
Extra rate for item no 9 above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre.
2 (Two) nos. extra lead
7286
-
6.79
... More
Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile.
2782
-
91.63
... More
3 (Three) nos extra lead.
2782
-
40.72
... More
Fitting, fixing bitumen drum sheet to bullah piling and wailing pieces including cutting straightening drum sheet fixing with country nails @ 20cm c/c at top & bottom and bolts& nuts at top & bottom at every joint of drum sheet with a laping of 15 cm, including supply of drum sheet, fixture all complete as per direction of the Engineer - in - charge.
160
-
494.33
... More
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisit thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For Construction of Sub Base by consolidating Laterite (90 mm to 45 mm):
Add cost at site of 1.45 m³ of materials to arrive at the complete rate.
7
-
2045.23
... More
Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification.
5.25
-
1764.55