Irrigation And Waterways Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date7 Mar 2025
Closing Soon13 Mar 2025
Tender Amount₹ 9,63,729
Costs
EMD
₹ 19,275Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Mr To Protection Work Of Pagli Bhutan Embankment Along Left Bank Of River Pagli For A Length Of 50 M At Lankapara Mouza Lankapara G.p. In Block Madarihat, P.s. Birpara, Dist Alipurduar
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_IWD_824079_11Tender No
WBIW/EE/APD/NIT-17(e)/2024-25Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. x 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump agreegates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces ) 3.00 metre x 0.46 metre nominal section (for apron only)
50
1266
63344
... More
0.75 metre x 0.45 metre nominal section.
388.6
411
159781
... More
Making rectangular / circular sausage cage with 10 SWG galvanized iron wire of 150 mm. x 150 mm. mesh wire netting with proper lapping of minimum 150 mm including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces).
1.50 metre diameter.
90
1003
90315
... More
Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting,fitting etc, complete as per direction of the Engineer - in - charge. Mesh size 125 mm x 125 mm with 10 SWG wire.
156
128
20079
... More
Labour charges for laying boulder/ shingles in apron or within wire netting of sausage for slope pitching including carriage upto 30 metre and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge. Boulder
9
280
2521
... More
Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for laying boulder in apron or within wire netting of sausage for slope pitching and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge.(Quarry bed belongs to Forest Deptt. Govt of W.B) N.B.-The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry side till such rates are modified by the forest department and department of industry, commerce and enterprises, Government of West Bengal.(a) for forest area royalty including entry fee and TP fee: Rs. 178.33 per cum . b) For non-forest area Royalty: Rs. 53.00 per cum Royalty (including other charges where ever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty (including othere charges where ever applicable, but excluding GST) will be deducted from the bills of works. Comprising Boulder above 30 kg each 70 % + Boulder above 20 kg each 20 % + Boulder above 10 kg each 10 %.
93
1640
152593
... More
Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for boulder pitching on top and slope by placing required boulders (Boulder within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub- grade by cutting or filling the earth on slope up to 7.5cm. depth, watering and ramming where necessary complete but excluding the cost of shingle of filling materials as per direction of the Engineer-in-charge.(Quarry bed belongs to Forest Deptt. Govt of W.B) N.B.-The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry side till such rates are modified by the forest department and department of industry, commerce and enterprises, Government of West Bengal.(a) for forest area royalty including entry fee and TP fee: Rs. 178.33 per cum Royalty (including other charges where ever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty (including othere charges where ever applicable, but excluding GST) will be deducted from the bills of works.
Comprising Boulder above 20 kg each 80 % + Boulder above 10 kg each 20 %.
34
1913
65046
... More
Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading, stacking and carriage and including all incidental charges like Royalty. (Quarry bed belongs to L. & L. R Deptt. Govt of W.B N.B.-The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry side till such rates are modified by the forest department and department of industry, commerce and enterprises, Government of West Bengal. b) For non-forest area Royalty: Rs. 106.00 per cum Royalty (including other charges where ever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty (including othere charges where ever applicable, but excluding GST) will be deducted from the bills of works.
5
1080
5405
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%