Irrigation And Waterways Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date17 Aug 2023
Closing Date24 Aug 2023
Tender Amount₹ 8,28,044
Costs
EMD
₹ 16,561Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_IWD_557678_13Bid Award Id
ViewTender No
WBIW/EE/KCD-I/e-NIT- 04(e)23-24Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by Department within a lead of 150 m.
236.95
25982
109.65
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. (a) Pakur variety
73.5
501201
6818.97
... More
Cast-in-situ cement concrete blocks or lining units as per designed section and specification,in nominal Mix. proportion 1:1.5:3 (correspomding to M20 grade) with well graded 20 mm down stone metal aggregate, laid in position by casting in alternative panels or otherwise to keep a gap of 12mm between the adjacent units, over a layer of polythene sheet of thickness not less than 100 micron to act as a separator between the bottom surface of the block and the sand cushion/ filter material laid below the blocks, including dressing, ramming, shuttering, finishing the exposed surface by trowel without adding any additional cement and sand mortar, curing and filling the gaps between the adjacent units by 5.6mm down coarse aggregate to be compacted properly, with all leads and lifts including supply and carriage of all materials, complete, without the cost of sand cushion/ filter.
Note:- Stone aggregates of pakur varieties.
2.83
22142
7838
... More
Precast cement concrete blocks or lining units as per designed section and specification, in nominal Mix. 1:1.5:3 (correspomding to M20 grade) with 20 mm down stone metal aggregate, including dressing, ramming, shuttering, finishing the surface by trowel without adding any additional cement and sand mortar, curing, transporting and laying the blocks or lining units at worksite in position, over sand cushion/filter layer, with cold (paper) joints between the adjacent units, having gap varying from 0 to 5 mm as tolerance, with all leads and lifts, including supply and carriage of all materials complete.
Note:- Stone aggregates of pakur varieties.
11.54
91342
7916.66
... More
Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.
1. Labour rate per cum including cost of sand added to arive at the complete item rate.
2. Compaction factor of dry clean sand is 0.835.
Medium Sand (Grading Zone II as per IS: 383-1970) stacked at site.
19.66
16196
823.78
... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
161.41
4616
28.6
... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per
specification and direction.
(b) Where staging is not required.
299.72
76444
255.05
... More
Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD. 600 mm dia
12.5
42971
3437.68
... More
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202 for Rural Roads of MORD. (a) Upto 600 mm dia Hume pipe.
12.5
2294
183.54
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements