Irrigation And Waterways Department Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Irrigation And Waterways Department Tender

Works
Civil And Construction
Eprocure
Opening Date25 Mar 2025
Closing Date11 Apr 2025
Tender Amount₹ 8,06,402 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour charges for bouIder pitching on top and slope by placing required boulders (each weighing 20Kg. and above within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub- grade by cutting or filling the earth on slope up to 7.5cm. depth, watering and ramming where necessary complete as per direction of the Engineer-incharge. Over Jhama Khoa / metal filter/ Geo-textile filter.

12

597

7165

... More
Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for boulder pitching on top and slope by placing required boulders (Boulder above 20kg each within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub- grade by cutting or filling the earth on slope up to 7.5cm. depth, watering and ramming where necessary complete but excluding the cost of shingle of filling materials as per direction of the Engineer-in-charge. (Quarry bed belongs to Forest Deptt Govt of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . Boulder above 20kg each

58

2167

125725

... More
Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading, stacking and carriage and including all incidental charges like Royalty.(Quarry bed belongs to L. & L. R Deptt. Govt of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . Shingles for Slope

20

1481

29634

... More
Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading, stacking and carriage and including all incidental charges like Royalty. (Quarry bed belongs to L. & L. R Deptt. Govt of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . Shingles for interstices

11

1052

11579

... More
Supplying to site empty cement polythene bags (capacity50kg) in good condition including stacking, incedental charges etc.all complete(capacity 50 kg).

3057

7

21858

... More
Labour charges for filling empty cement gunny bag/ polythene bag (capacity50kg ) with all kinds of earth (wet or dry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted),and stacking within alead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:-Volume of earth/ sand filled bags should not be less than 0.028cum/ bag.

3057

8

25495

... More
Dumping in position earth/ sand filled gunny/ poly bags (capacity50kg) within a lead of 30 metre inclusive of all lifts.

3057

3

10944

... More
Making rectangular /circular sausage cage with 10 SWG galvanized iron wire of 150mm.x150mm. mesh wirenetting with proper lapping of minimum 150mm including sewing the joints with 12 SWG GI wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder /lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces)

100

1003

100350

... More
Supplying, fitting, fixing end pieces for rectangular/ square/ circular sausages at the ends, with10SWG/ 8SWG GI wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150 mm all around with 12 SWG GI wire complete, including the cost of supply of wirenetting, fittingetc, complete as per direction of the Engineer-in-charge.

45

110

4988

... More
Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty but exclusive labour charges for laying boulders in apron as per direction of the Engineer-in-charge. (Quarry be belongs to Forest Deptt Govt of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . Boulder above 30kg each

151.39

1631

246973

... More
Quarrying, Carrying, Supplying bed material/Coarse sand from the Engineer-in-charge selected quarrying site to the site of work excluding cost of material, loading, unloading, stacking and carriage and including all incidental charges like Royalty but excluding the cost of labour charges for laying bed materials laying uniformly side slopes including all leads and lifts complete. (Quarry bed belongs to L. & L. R Deptt. Govt of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works Bed materials/coarse sand

86

909

78230

... More
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. a) In ground floor including roof.

0.57

532

305

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. River bazree

0.57

4627

2652

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm shuttering without staging in foundation

4.68

390

1829

... More
Clearing and removal of debris(including floating debris)including sludge & slush mixed with all sorts of industrial waste,solid/semi-solid compact mass for meddue to water hyacinthin combination with industrial wastes,carcasses,municipal garbage sludge,polypacks,thick and thorny jungles and long grass etc.and depositing,spreading the same on the canal bankandlaterburnttoasheswhendryincludingallleadsandliftscomplete.

405

35

14479



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.