Irrigation And Waterways Department Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Irrigation And Waterways Department Tender

Works
Civil And Construction
Eprocure
Opening Date29 Jan 2025
Closing Date5 Feb 2025
Tender Amount₹ 7,66,645 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extra rate for each addl floor over the rate of ground floor. (i) 2nd Floor

0.54

119

65

... More
Extra rate for each addl floor over the rate of ground floor. (i) 3rd Floor

0.54

178

97

... More
Extra rate for each addl floor over the rate of ground floor. (i) 4th Floor

0.54

238

130

... More
Extra rate for each addl floor over the rate of ground floor. (i) 5th Floor

0.54

297

162

... More
Extra rate for each addl floor over the rate of ground floor. (i) 6th Floor

0.54

357

195

... More
Extra rate for each addl floor over the rate of ground floor. (i) 7th Floor

0.54

417

227

... More
Extra rate for each addl floor over the rate of ground floor. (i) 8th Floor

0.54

476

259

... More
Extra rate for each addl floor over the rate of ground floor. (i) 9th Floor

0.54

536

292

... More
Extra rate for each addl floor over the rate of ground floor. (i) 10th Floor

0.54

595

324

... More
Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.

277.2

22

6276

... More
Mazdoor

50

495

24778

... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge

12.95

197

2563

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:4 cement mortar 15 mm thick Plaster

277.2

194

53921

... More
10 mm thick Plaster

40.26

155

6263

... More
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement (i) 25 mm thick In ground floor.

40.26

314

12673

... More
Extra rate for each addl floor over the rate of ground floor. (i) 1st Floor

4.35

4

21

... More
Extra rate for each addl floor over the rate of ground floor. (i) 2nd Floor

4.35

9

41

... More
Extra rate for each addl floor over the rate of ground floor. (i) 3rd Floor

4.35

14

62

... More
Extra rate for each addl floor over the rate of ground floor. (i) 4th Floor

4.35

18

82

... More
Extra rate for each addl floor over the rate of ground floor. (i) 5th Floor

4.35

24

106

... More
Extra rate for each addl floor over the rate of ground floor. (i) 6th Floor

4.35

29

130

... More
Extra rate for each addl floor over the rate of ground floor. (i) 7th Floor

4.35

35

154

... More
Extra rate for each addl floor over the rate of ground floor. (i) 8th Floor

4.35

40

178

... More
Extra rate for each addl floor over the rate of ground floor. (i) 9th Floor

4.35

46

202

... More
Extra rate for each addl floor over the rate of ground floor. (i) 10th Floor

4.35

51

226

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.

40.26

39

1571

... More
Supplying fitting and fixing in position approved P.V.C. door frame (Matt finish) made of extruded P.V.C. multichamber hollow section having dimensions 60mm x 50mm x 2mm (+/-0.2mm), horizontal section will be joined with vertical section by galvanised steel screws after inserting two number steel brackets as reinforcement making suitable space for placing hinges, one steel tube 40mm x 20mm x 1.20 mm will be inserted on one full vertical side of the frame (hinge side) as reinforcement, the frame will then be fixed in the opening with the help of P.V.C. expandable fastner /wooden gutties and galvanised steel screws including cost of all materials and labour, hire charges of tools and appliances, carriage of all materials, taxes and all other incidental charges complete.

61.2

332

20350

... More
Supplying, Fitting & Fixing 30 mm thick Factory made solid Panel PVC Door Shutter consisting of outer frame made out of M.S. tubes of 19 gauge thickness and size 19 mmx19 mm for styles, top and bottom rails, M.S. frame shall have cost of steel primers of approved make and manufacture, M.S. frame covered with 5 mm th. heat moulded PVC “C” channel of size 30 mm th, 70 mm width out of which 50 mm shall be flat and 20 mm shall be tapered in 45 degree angle on either sides forming styles; and 5 mm th. 95 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm tapered in 45 degree on the inner side to form top & bottom rail and 115 mm wide PVC sheet out of which 75mm shall be flat and 20 mm shall be tapered on both sides to form lock rail. Top, bottom and lock rails shall be provided either side of the panel with 10 mm (5 mmx2) th.,20 mm wide cross PVC sheet as gap insert for top rail and bottom rail. Paneling of 5 mm th. both side PVC sheet to be fitted in the M.S. frame welded/sealed to the styles &rails with 7 mm (5 mm+2 mm) th.x15 mm wide PVC sheet beading on inner side and joined together with solvent cement adhesive. An additional 5 mm th. PVC strip of 20 mm which is to be stuck on the interior side of the “C” channel using PVC solvent adhesive etc. complete excluding all necessary hardwares as per direction of Engineer-in-Charge. In ground floor.

16.2

2315

37514

... More
Renewing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. In cement concrete(1:2:4) including cutting of brick work/concrete work as per direction. (a) 40mm X 6mm, 250mm Length

48

56

2688

... More
Anodised aluminium butt hinges of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 205/66) and fitted and fixed with cadmium plated screws: 100x63x3.2mm

48

85

4119

... More
Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16mm dia rod with centre bolt and round fitting. 200 mm long

12

159

1916

... More
Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer - in - Charge.

11.13

107

1193

... More
Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment]

4.46

931

4156

... More
Applying 2 coats of Non-Toxic Acrylic Polymer modified Paint having adhesive & waterproofing properties by mixing in proportion (1 liquid: 4 cementitious material) or as per manufacturer's specification for water proofing layer in water tank etc. (No Departmental Cement is required)

43.5

307

13375

... More
Polymer concrete made with water resistant bonding agent of synthetic rubber emulsion as per manufacturer's specification excluding the cost of cement concrete (2.75 Kg / bag of cement)

5.44

5260

28607

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. In ground floor.

6.53

6914

45117

... More
Extra rate for each addl floor over the rate of ground floor. (i) 1st Floor

0.65

113

74

... More
Extra rate for each addl floor over the rate of ground floor. (i) 2nd Floor

0.65

226

148

... More
Extra rate for each addl floor over the rate of ground floor. (i) 3rd Floor

0.65

339

222

... More
Extra rate for each addl floor over the rate of ground floor. (i) 4th Floor

0.65

452

296

... More
Extra rate for each addl floor over the rate of ground floor. (i) 5th Floor

0.65

591

386

... More
Extra rate for each addl floor over the rate of ground floor. (i) 6th Floor

0.65

729

476

... More
Extra rate for each addl floor over the rate of ground floor. (i) 7th Floor

0.65

867

567

... More
Extra rate for each addl floor over the rate of ground floor. (i) 8th Floor

0.65

1005

657

... More
Extra rate for each addl floor over the rate of ground floor. (i) 9th Floor

0.65

1144

747

... More
Extra rate for each addl floor over the rate of ground floor. (i) 10th Floor

0.65

1282

837

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (i) Tor steel/Mild Steel SAIL/ TATA/RINL For works in foundation and upto roof of ground floor/upto 4 m

1.02

65447

67019

... More
Extra rate for each addl floor over the rate of ground floor. (i) 1st Floor

1.02

57

59

... More
Extra rate for each addl floor over the rate of ground floor. (i) 2nd Floor

1.02

114

117

... More
Extra rate for each addl floor over the rate of ground floor. (i) 3rd Floor

1.02

171

176

... More
Extra rate for each addl floor over the rate of ground floor. (i) 4th Floor

1.02

228

234

... More
Extra rate for each addl floor over the rate of ground floor. (i) 5th Floor

1.02

295

303

... More
Extra rate for each addl floor over the rate of ground floor. (i) 6th Floor

1.02

362

371

... More
Extra rate for each addl floor over the rate of ground floor. (i) 7th Floor

1.02

429

439

... More
Extra rate for each addl floor over the rate of ground floor. (i) 8th Floor

1.02

495

508

... More
Extra rate for each addl floor over the rate of ground floor. (i) 9th Floor

1.02

562

576

... More
Extra rate for each addl floor over the rate of ground floor. (i) 10th Floor

1.02

629

644

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. upto roof of ground floor

46.5

399

18565

... More
Extra rate for each addl floor over the rate of ground floor. (i) 1st Floor

4.65

21

100

... More
Extra rate for each addl floor over the rate of ground floor. (i) 2nd Floor

4.65

42

199

... More
Extra rate for each addl floor over the rate of ground floor. (i) 3rd Floor

4.65

64

299

... More
Extra rate for each addl floor over the rate of ground floor. (i) 4th Floor

4.65

85

399

... More
Extra rate for each addl floor over the rate of ground floor. (i) 5th Floor

4.65

112

521

... More
Extra rate for each addl floor over the rate of ground floor. (i) 6th Floor

4.65

138

643

... More
Extra rate for each addl floor over the rate of ground floor. (i) 7th Floor

4.65

164

765

... More
Extra rate for each addl floor over the rate of ground floor. (i) 8th Floor

4.65

190

887

... More
Extra rate for each addl floor over the rate of ground floor. (i) 9th Floor

4.65

216

1009

... More
Extra rate for each addl floor over the rate of ground floor. (i) 10th Floor

4.65

243

1131

... More
Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) For exposed work PVC pipes (Dia) 32 mm

200

281

56252

139

348

48373

60

457

27459

80

915

73224

... More
Supply of Chlorinated Polyvinyl Chloride (CPVC) pipes (i) Socket 32 mm

8

40

324

16

72

1163

10

175

1752

... More
Male threaded adopter (Brass threaded) 32 mm

36

516

18578

38

697

26494

26

1302

33869

... More
Female threaded adopter (Brass threaded) 32 mm

32

625

20022

40

729

29175

15

1128

16929

... More
Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) i) Water based interior grade Acrylic Primer

325.05

3670

11932

... More
Dry Distemparing to interior walls or ceiling including cleaning, washing, smoothening surface Two Coat

325.05

58

18983



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.