Irrigation And Water Resources Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Water Resources Department Tender
Civil And Construction
Eprocure
Opening Date18 Feb 2025
Closing Date25 Feb 2025
Tender Amount₹ 2,66,897 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 5,338Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
.- Wbiw/sdo/eisd/nit-02/2024-25/2
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_IWD_817177_2Tender No
WBIW/SDO/EISD/NIT-02/2024-25Tender Authority
Irrigation And Water Resources Department ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(iii) 15.00 cm. Av. Diametre.
117.5
125
14704
... More
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site (b) Width of thinner end above 15 cm
(i) Jhaw / Eucalyptus.
171
228
39130
... More
Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length).
86.4
34
2986
... More
Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary.
36
13
472
... More
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
810
7
5792
... More
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag
810
8
6755
... More
Extra rate for item no above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre.
3(three) nos extra leads
810
10
8691
... More
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
810
3
2900
... More
Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile.
23
96
2220
... More
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of including Royalty
B :- Measurement to be taken on the basis of stack measurement / pre post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. C) Beyond 3.00 km and upto 4.00 km
159.3
331
52835
... More
1st class bats delivered and stacked at site.
12.6
1327
16729
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements