Inland Waterways Authority Of India Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Inland Waterways Authority Of India - IWAI Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date20 Dec 2024
Closing Soon27 Dec 2024
Tender Amount₹ 45,57,549 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ for MV RN Tagore
Tender document for RETENDER FOR DRY DOCK REPAIR OF M. V. LAL BAHADUR SHASTRI AND M. V. RABINDRA NATH TAGORE FOR THE YEAR 2024-25
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cropping & renewal of underwater plate, deck plate, Ship side plate, side fender pipe, flat bar & other fitments is to be done as per UT gauging report and Hull Plates including Deck & Internal Structures in way of Tanks and Engine Room Bilges to be examined, Emergency fire pump exhaust pipe on forward main deck found damaged, 2 nos. of goose neck vent cover for fresh water tank (P & S) found rusted, damaged , Steering compartment blower mushroom head spindle found missing, engine room skylight vent cover found rusted, etc. to be repaired/rectified as required as per direction of Surveyor/EIC.

10

132048

1320480

... More
All Sea Chests, Suction Valves, OBD valves, Emergency fire pump Delivery valve found non-operational , Cargo hold suction (4 Nos.) to be non-operational etc. to be checked ,overhauled, repaired, cleaned and painted as required per direction of EIC/Surveyor.

1

41923

41923

... More
Engine Room piping system (Fuel oil, bilge, fresh water, Lube oil and Sea main) including valves and fittings,need servicing & overhauled, pressure tested and pipe lines to be clean and make operational & leak free as required as per direction of EIC/ Surveyor.

1

52403

52403

... More
Under water hull plate including Deck & Internal Structures in way of Tanks and Engine Room found with Oil & bilges same to be scraped & chipped & wire brushed, cleaned and painted from keel to LWL to remove fouling and old paints and painting of the same to be done by 3 coats as per painting scheme (1 coat zinc chromate primer, followed by two coats of existing colour of marine paints) from keel to water level as per direction of Surveyor/ EIC.

1

132000

132000

... More
Chipping, Scrapping & Painting of Hull & Appendages, Deck, tanks, void spaces/tanks & Appendages to be carried out and the entire ship side shell plate from LWL to main deck, deck plate, ship side, superstructure, wheel house deck, cargo hold/space, bathroom, galley inside, anchor locker/compartment, engine room, engine room machineries, deck machinery and outside along with other fitment etc, are to be proper cleaned by water jet, scrapped, wire brushed, chipped and painted by 3 coats of existing colour marine paint. (1 coat zinc chromate primer, followed by two coats of existing colour of marine paints). All pipe lines should be coloured as per marine colour code. After it name of vessel, dept. and logo to be made by fluorescent sticker as required as per direction of EIC/ Surveyor.

1

1012000

1012000

... More
The opening and repair of the propeller to be carried out using the same material composition, along with fairing, balancing, and bedding as required. The new propeller to be fitted after bedding and other associated works, with the renewal of spares including labour and materials as required as per direction of (EIC)/Surveyor. (The new propeller will be provided by IWAI.

2

31443

62886

... More
Opening and fitting of propeller shaft, bushes, rudder and rudder stock after removal straightening, re-metalling, machining, bedding etc. works to be done including labour and materials as required as per direction of EIC/ Surveyor.

2

125763

251526

... More
Zinc Anodes to be replaced as required including material & labour charges per direction EIC/ Surveyor.

17

2623

44591

... More
4 Nos. of fire bucket found missing same to be supplied of marine quality and All other Fire hydrant valves, nozzles, fire hose box, couplings etc. to be checked serviced/ renewed and have to make leak free operation as required as per direction of EIC / Surveyor.

-

-

-

... More
Labour charges

1

10000

10000

... More
Cost of spares (actual + 10%)

-

-

-

... More
All quick closing valve to be made operational and all the valve to be made markings and stenciling to identify valves and ensure safe operation by means of paint or equivalent as required as per direction of EIC/ Surveyor.

1

10017

10017

... More
All the electrical wiring in Engine room found hanging to be secured, Emergency blackout system found non-operational, Remote stop for- accommodation fan 1 & 2, fuel oil pump and toilet exhaust fan found nonoperational, Magnetic compass on wheel house deck found non-operational, Forward flood light found non-operational, LP (230 V) operation to be shown, NLP (24V) found non-operational, etc to be repaired/ rectified to made operational and all the others A.C /D.C electrical Line & equipment etc. to be checked after opening of celling panel if required and repaired as required as per direction of EIC/Surveyor.

-

-

-

... More
Labour charges

1

55020

55020

... More
Cost of spares (actual + 10%)

-

-

-

... More
HSD reserve tank to be cleaned properly and diesel wash to be done as required as per direction of EIC/Surveyor.

2

8125

16250

... More
HSD service tank to be cleaned properly and diesel wash to be done as required as per direction of EIC/ Surveyor

2

1875

3750

... More
Fresh water tank to be cleaned properly as required as per direction of EIC/ Surveyor.

2

9375

18750

... More
Wheel house entrance wooden door (P & S) found damaged, same to be repaired/ renewed with existing wood and lock and requisite materials with all accssories as required as per direction of EIC/ Surveyor.

-

-

-

... More
Labour charges

1

10164

10164

... More
Cost of spares (actual + 10%)

-

-

-

... More
Afloat Repair

-

-

-

... More
Shaft RPM indicator (P & S) on wheel house found non-operational, Main engine digital RPM indicator (P & S) on wheel house found non-operational, etc. to be repaired/ rectified and made operational with renewal of spares as required as per direction of Surveyor/EIC .

-

-

-

... More
Labour charges

4

9345

37380

... More
Cost of spares (actual + 10%)

-

-

-

... More
Anchor windlass ampere meter found non-operational and sight glass found broken, Anchor winch operation to be verified etc. to be repaired/ rectified and also the anchor winch gearbox, oil seals , bearings, packings etc. to be recified and Anchor winch transmission gearbox servicing to be done with checking/rectification of brake shoes, oil seals, bearings, oil glass gauge indicator etc. and renewal of gear oil. Anchor chain to be calibrated, drawn out, chipped, wire brushed and Anchor, anchor chain and chain locker/compartment to be painted with one coat of zinc chromate primer followed by two coats of existing colour marine paints including labour charges and materials costs as per direction of EIC/Surveyor as required as per direction of EIC/ Surveyor.

-

-

-

... More
Labour charges

2

36750

73500

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Bilge/GS/Fire/Ballast pump No. 1 found with abnormal noise, No. 1 Fresh Water pump found non-operational, No. 1 Fuel oil transfer pump found non-operational, 4 nos. of hand pump on forward main deck found non-operational, 4 nos. of cargo hold suction pump operation to be verified, Main fire pump operation to be verified , etc. to be repaired/ serviced and all other pumps to be checked & made operational including motors, its pressure gauges etc. at suction/discharge including renewal of spares such as gland seals, bearings etc. as required all complete as per direction of Surveyor/ EIC.

-

-

-

... More
Labour charges

1

33031

33031

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Fuel oil service tank for both main engine and diesel generator found with leakages and level gauge found non-operational, etc. to be rectified / repaired for leak free operation and also All hydraulic lines to be checked and leakage to be arrested with renewal of its gaskets, seals, orings, high pressure hoses, etc as required and make leak proof, Accommodation deck -davit found damaged and non-operational same to be made operational as required as per direction of EIC/ Surveyor.

-

-

-

... More
Labour charges

1

34500

34500

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Harbour generator( 15 KVA) set operation not shown to be verified and battery for starting found missing same to be make operational and Complete overhauling of the genset engine to be done through checking/servicing/calibration of the iner, piston, rings, valves, heads, fuel pump, injectors, sea water and fresh water pump, crank thrust clearance, self starter, dianamo and cleaning of all coolers etc. along with renewal of spares e.g. meters, gauges, V-belts, hose pipes, sea water pumps, freshwater pump etc. servicing of self starter, dynamo, checking/rectification of all safety systems, cleaning of heat exchanger & coolers as required as per direction fo EIC/ surveyor

-

-

-

... More
Labour charges

1

16500

16500

... More
Cost of spares(actual + 10%)

-

-

-

... More
11 Nos. natural vent on main deck rubber packing found damaged, nos. of hatches on forward main deck opening and closing arrangement found jammed to be made operational, 2 nos. of goose neck vent cover for fresh water tank (P & S) rubber packing found missing , 2 nos. goose neck vent cover (on accommodation deck) found rusted and rubber packing found missing, 4 nos. of blower vent in wheel house deck to be made operational, Engine room skylight vent cover rubber packing found damaged, Engine room exhaust inspection door and hatch cover rubber packing found damaged etc. to be repaired/ replaced and all others manhole covers, all window, all blower, outside doors, air vents & all hatches/ Tank covers with damaged rubber packing/ beading, nuts,bolts & studs same to be repaired/ renewed by good quality of rubber packing/ beading & SS fittings respectively as required as per direction of EIC/ Surveyor. (All ventilation /blower mushroom head opening and closing heads spindle to be made operational for smooth operation.)

-

-

-

... More
Labour charges

1

55000

55000

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Steering compartment blower found non-operational, 2 nos. of blower in wheel house deck found non operational, etc to be serviced to made operational and all other blowers to be checked, repaired & make operational as required as per direction of EIC/ Surveyor.

-

-

-

... More
Labour charges

1

24750

24750

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Main Engine (P & S) safety panel found non-operational, alarms and trips not shown. Main Engine (P) battery charger indicator found non-operational, Main Engine (P) found non-operational, Engine operation from wheel house to be shown, Emergency stop for main engine (P & S) on wheel house found non- operational etc to be rectified/ repaired with calibration of fuel pump and injector along with Servicing of both Main Engine (S) (cummins make N- 743 TM, BHP- 195) to be done with arresting all oil & water leakage with renewal of spares i.e. filters, lub oil, coolents, V- belts, cleaning of heat exchanger, lub oil cooler etc for made operational the engine. All safety system to be chacked and made operational including all meter & safety alarms installed in engine room as well as wheel house as required as per direction of EIC/ Surveyor.

-

-

-

... More
Labour charges

2

22008

44016

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
Generator set (P) found non-operational etc. to be rectified / operational through Complete Overhauling of Both genset engine (Make Simsons, BHP- 50) is to be done with checking/calibration/renewal/servicing of liner, piston, rings, valves, heads, fuel pump, injectors, sea water and fresh water pump, crank thrust clearance, self starter, dianamo and cleaning of all coolers etc. along with renewal of spares e.g. meters, gauges, V-belts, hose pipes, sea water pumps, freshwater pump etc. servicing of self starter, dynamo, checking/rectification of all safety systems, cleaning of heat exchanger & coolers as required as per direction fo EIC/ surveyor.

-

-

-

... More
Labour charges

2

40000

80000

... More
Cost of spares(actual + 10%)

-

-

-

... More
Both Mannualy and joystick steering gear operation not shown and same to be make operational the whole system as required as per direction of EIC/ Surveyor.

-

-

-

... More
Labour charges

1

15000

15000

... More
Cost of spares(actual + 10%)

-

-

-

... More
7 nos. of lifebuoy found damaged same to be Supply of reputed/approved make life buoy with required standards/certification, vessel name printed, whistle, rope and all necessary accessories as per applicable norms, all complete as required, as per direction of EIC/Surveyor.

7

4000

28000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.