Inland Waterways Authority Of India Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Inland Waterways Authority Of India - IWAI Tender

Works
Eprocure
Opening Date4 Oct 2024
Closing Date21 Oct 2024
Tender Amount₹ 14,94,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
All sea chest, mud box, strainer is checked, repaired, cleaned and painted as per direction of EIC/Surveyor.

2

15400

7700

... More
Engine room piping system (F.O, Bilge, fresh water & sea main) including valves & fittings found leakage at various location needs servicing & valves to be overhauled, pressure tested and pipe lines to be clean and make operational & leak free as required as per direction of EIC/ Surveyor.

1

55000

55000

... More
Tally marks on various components missing and same to be made and the entire ship side shell plate from LWL to main deck, deck plate, superstructure, bathroom, galley inside, anchor chain, anchor locker/compartment, engine room and outside along with other fitment etc, are to be proper cleaned, scrapped, wire brushed, chipped and painted by 3 coats of existing colour marine paint. (1 coat zinc chromate primer, followed by two coats of existing colour of marine paints). All pipe lines should be coloured as per marine colour code. After it name of vessel, dept. and logo to be made by fluorescent sticker as required as per direction of EIC/ Surveyor.

1000

253092

253.09

... More
Under water hull plate & side plate to be scraped & chipped & wire brushed from keel to LWL to remove fouling and old paints and painting of the same to be done by 3 coats as per painting scheme from keel to water level as per direction of Surveyor/ EIC.

300

79229

264.1

... More
Steering room hydraulic oil leakage observed form oil seal same to be repaired through overhauling, repair and maintenance of both sides Well mounted fixed pitch Azimuth Thruster units’ type ZF AT 2111, Power: 220/KW at 1800 rpm. Propeller 800 mm diameter in Nozzle, Reduction ratio: 2.4:1, is to be done i.e. Propellers, gears, drives, seals, filters, solenoid switches, limit switches, v/v, high pressure lines, PCB controllers, pid controller, oil, bush and joystick control from wheelhouse to be checked & repaired, all oil cooler to be cleaned , etc. as required as per direction of EIC/ Surveyor.

-

-

-

... More
Labour charges

1

165000

165000

... More
Cost of spares (actual + 10%)

-

-

-

... More
Sacrifical (Zinc) anodes to be renewed as per direction of EIC/ Surveyor.

16

70400

4400

... More
Steering room found with oily bilges/ dirty water, engine room found with oily bilges/dirty water/soft mud same to be clean & painted with one coat primer and 2 coats of marine quality paints as per direction of EIC/Surveyor

2

99000

49500

... More
All HSD service tank 2 nos (capacity - 0.46 cu.m), HSD reserve tank 1 no. ( capacity - 23.49 cu.M), and fresh water tank 1 no. (capacity- 11.40 cu.M), void tank 2 nos. to be cleaned and painted as per Owener's/ paint manufacturer's paint scheme including labour charge and material as required as per direction of EIC/ Surveyor.

6

105600

17600

... More
All weather tight hatch (store room, fore peak, emergency engine room exit, steering gear ompartment) rubber gaskets found wasted/deteriorated and hardened, Engine room door & engine room ventilation hatch (P& S) weather tight rubber gaskets found wasted/deteriorated and hardened, and all the others damaged rubber packing/ beading, nuts,bolts & studs same to be repaired/ renewed by good quality of rubber packing/ beading & SS fittings respectively as per direction of EIC/ Surveyor.

-

-

-

... More
Labour charges

1

16500

16500

... More
Cost of spares (on Actual + 10 % basis )

-

-

-

... More
QCV valve (P) found non-functional same to be make operational and all others quick closing valves to be checked and to be make operational with levelling indication mark of valves as required as per direction of Surveyor /EIC.

1

10500

10500

... More
Emergency fire pump hose pipe found missing, Fire Hose 3 nos. found damage same to be supplied fitted with couplings and All Fire hydrant valves, nozzles, couplings, fire hose box (2nos.) etc. to be serviced/ renewed and have to make leak free operation as required as per direction of EIC /Surveyor.

-

-

-

... More
Labour charges

1

4400

4400

... More
Cost of spares (actual + 10%)

-

-

-

... More
Gear Oil pressure gauge (P & S) found non-functional, and all others gauges to be checked and replaced in wheel house, engine room, deck, steering room etc. as required as per direction of EIC/ Surveyor.

-

-

-

... More
Labour charges

1

23000

23000

... More
Cost of spare (actual + 10% basis)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.