Indianoil Petronas Private Limited Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Indianoil Petronas Private Limited - IPPL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date22 May 2024
Closing Date28 May 2024
Tender AmountRefer Documents
Costs
EMD
₹ 22,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IPPL_196137_1Bid Award Id
ViewTender No
IPPL/BP/2024-25/LT-03Tender Authority
Indianoil Petronas Private Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supplying and filling in plinth with sand within specified grading zone of fine aggregates specified in table 3.1, clause 3.1.3 of attached specifications under floors, etc. in layers not exceeding 20cm in depth, each deposited layer to be compacted by ramming including watering, consolidating and dressing complete.Local Fine Sand within grading zone IV
4
-
-
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars & disposal of unserviceable material outside site to an unobjectionable place as/ direction of Engineer-in-charge
1.5
-
-
Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge.
10
-
-
Providing and laying in position cement concrete of specified grade excluding cost of centering & shuttering. All work up to plinth level:
-
-
-
1:3:6(1 Cement : 3 Coarse Sand : 6 Graded stone aggregate of 20mm)
2.5
-
-
Providing and laying in position, machine batched & machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement. Including admixtures in recommended proportions as per IS 9109 to accelerate, retard setting of concrete,improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Less cement used as per design mix (if any) will be recoverable separately. No extra payment against extra cement if used shall be payable.
-
-
-
i) M-25 grade reinforced cement concrete UP TO PLINTH LEVEL
2
-
-
ii) M-25 grade reinforced cement concrete ABOVE PLINTH & UP TO FLOOR 5 LEVEL
5
-
-
Centering and shuttering including strutting, propping etc. and removal of form for :
-
-
-
Foundations, footings,bases of columns, Slab etc. for mass concrete
220
-
-
Supply of Steel reinforcement for R.C.C. including straightening, cutting, bending, placing in position and binding all complete at all levels
-
-
-
Thermo Mechanically Treated Bars of Fe- 500D grade or more, conforming to IS1786
17
-
-
Providing & Laying Reinforced cement concrete work in walls (Any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level UP TO FLOOR V LEVEL excluding cost of centering, shuttering, finishing and reinforcement :
-
-
-
i) RCC 1 Cement :1 Coarse Sand: 2 Graded Stone Aggregate 20mm
15
-
-
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS:13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion, Single socketed pipes.
-
-
-
160 mm diameter PVC Rain water pipe
24
-
-
Providing and laying bitumen mastic wearing course (as per specifications) with industrial bitumen of grade 85/25 conforming to IS:702 prepared by using mastic cooker and laid to required level and slope including providing antiskid surface with bitumen precoated fine grained hard stone chipping of approved size at the rate of 0.005 cum per 10 sqm and at approximates spacing of 10cm centre to centre in both directions, pressed into surface protruding 1mm to 4mm over mastic surface, including cleaning the surface, removal of debris etc. all complete (Considering bitumen using 10.2% as per MORTH specification).)
-
-
-
25mm thick on floor
80
-
-
Supplying, fabrication and erection hanr railing with 40NB GI pipe
40
-
-
Structural painting
80
-
-
Surface cleaning by using air blower as per technical specification & application of Sika® Ferrogard®-903 or Fosroc make Nitoprime 320PU/Dekguard EP302 or equivalent by suitable means as Per manufacturer’s recommendation and as per the direction of Engineer-in-Charge. The rate inclusive of labours, materials, tools &tackles, all complete. (Including scaffolding)
30
-
-
Surface preparation by mechanically or manually, cleaning, application of two coats of UV resistance protective coating based on us resin Sikagard® PU(UR) /Dekguard PU or equivalent on external concrete Surface as per manufacturer’s recommendation and technical specification and as per the direction of Engineer-in-Charge, including labour, materials, tools, tackles, curing all complete. (Including scaffolding)
30
-
-
Extension of Sprinkler pipeline
1
-
-