Howrah Improvement Trust Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Howrah Improvement Trust - HIT Tender

Works
Eprocure
Opening Date14 Aug 2018
Closing Date4 Sep 2018
Tender Amount₹ 1,50,75,854 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes. Pakur variety.

135

-

5318.1

... More
Brick work with first class bricks in cement motar (1:4). In foundation and plinth.

417

-

5483

... More
Brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench (on both side of the edging) with spoils and ramming the same thoroughly complete as per direction. Brick-on-end edging (250 mm) depth.

3600

-

8959

... More
Ordinary cement concrete (Mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any. In Ground Floor as per relevant IS codes. Pakur Variety in Ground Floor

455

-

5871.39

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) i) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.

630

-

334

... More
ii)25 mm to 30 mm shuttering without staging in foundation.

955

-

209

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel I. Other than SAIL/ TATA/RINL

24.1

-

58103

... More
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement

642

-

316

... More
Plaster (to wall, floor, ceiling etc) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary (G.F.)[excluding cost of chipping over concrete surface] 15mm thick 4:1.

1700

-

156

... More
Neat cement punning about 1.5mm thick in wall dado, window sills, floor, drain etc.

1700

-

34

... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete, including the cost of supply of sand. (Payment to be made on measurement of finished quantity) by silver sand

432

-

76791

... More
Providing construction Joint at Concrete road with 12mm thick Thermokal Board in position including cutting to requisite size and shape all complete as per direction of Engineer -in -Charge.

65

-

114.84

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight.

840

-

20

... More
Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S- 12592(M.D)5 MT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size Cover: 470 mm X 420 mm X 80 mm Frame: 590 mm X 550 mm X 170 mm opening: 380mm x 305mm Weight: 100 kg (approx)

349

-

2001

... More
Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. i)125 mm diameter

8860

-

145

... More
Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 125 mm diameter

6250

-

92

... More
Coal tarring on wooden surfaces including cost of materials. Single coat.

3280

-

22

... More
Supplying fitting and fixing with iron nails, half spilt bamboo walling pieces dia of bamboo not less than 5 cm to be measured at the mid length.

1000

-

22.6

... More
Darma Mat works placed, fitted and fixed withframe work or behind pilling works and tied with 22 SWG,GI wire as per direction including cost, carriage and supplying all materials to site complete. Double darma

375

-

185.6

... More
Supplying empty Cement bags in good condition.

5560

-

330

... More
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags.

5560

-

350

... More
Dumping in position earth filled poly bags from stacks, where necessary, in stagnant / flowing water inclusive of all leads and lifts.

5560

-

0.79

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km. including the cost of carried earth.

105

-

39901

... More
Add 12% GST on item no 1 to 19

1

-

1599277.32

... More
Add 01% Cess on item no 1 to 20

1

-

149265.88



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.