Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Howrah Improvement Trust - HIT Tender

Works
Eprocure
Opening Date11 Sep 2018
Closing Date25 Sep 2018
Tender Amount₹ 53,89,509 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dressing and chilchalling road flanks including cutting and filling with earth upto 150mm. Average thickness finished with outward cross-drade of 1in30.

2165

-

12.2

... More
Single Brick Flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

2085

-

355

... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete, including the cost of supply of sand. (Payment to be made on measurement of finished quantity) by silver sand

240

-

71181

... More
Brick work with first class bricks in cement motar (1:4). In foundation and plinth.

150

-

5483

... More
Supplying ready mixed concrete of M 20 Grade with well graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work, compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. [Cement to be supplied by the Manufacturer or supplier] In ground floor and foundation. (i) Without approved concrete pump.

280

-

6525.44

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]. (ii) With 1:4 cement mortar. (b) 15 mm thick plaster

1660

-

156

... More
Neat cement punning about 1.5mm thick in wall dado, window sills, floor, drain etc.

1660

-

34

... More
Providing construction Joint at Concrete road with 12mm thick Thermokal Board in position including cutting to requisite size and shape all complete as per direction of Engineer -in -Charge.

70

-

114.84

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.

55

-

11927

... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge

20

-

166

... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.

5

-

714

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction Tor steel / Mild steel.( SAIL/ TATA/ RINL ) (a) In foundation, basement and upto roof of ground floor/upto 4 M.

1.5

-

58103

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(b) Steel shuttering or 9 to 12 mm. thick approved quality ply board shuttering.(f) 25 mm to 30 mm shuttering without staging in foundation

65

-

209

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety

24.5

-

5192.7

... More
Ordinary cement concrete(mix1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any as per relevent IS code. Pakur varity. a) In Ground floor

15

-

5748.84

... More
Labour for taking out old soling edging including removing debris (a) Single flat soling

630

-

981

... More
Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth.

252

-

40

... More
Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. 125 mm diameter

2230

-

145

... More
Coal tarring on wooden surfaces including cost of materials. Single coat.

920

-

22

... More
Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 125 mm diameter

1435

-

92

... More
Darma Mat works placed, fitted and fixed withframe work or behind pilling works and tied with 22 SWG,GI wire as per direction including cost, carriage and supplying all materials to site complete. Double darma

53

-

171

... More
Supplying empty Cement bags in good condition.

1165

-

330

... More
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags.

1165

-

350

... More
Labour for fitting and fixing 10 cm to 13 cm diameter Eucalyptus-ballah as ties and runners including necessary nails, bolts and nuts.

95

-

20.6

... More
Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.

400

-

19

... More
G.S.T @12% for the items from Sl no. 1 to 28 on Rs. 4764417.80

1

-

571730.14

... More
Labour welfare cess @1% from Sl no. 1 to 29 on Rs. 5336147.94

1

-

53361.48



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.