Howrah Improvement Trust Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Howrah Improvement Trust - HIT Tender

Works
Civil Works Others
Eprocure
Opening Date2 Jan 2020
Closing Date18 Jan 2020
Tender Amount₹ 54,59,883 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
iv)For each SET shifting

9120

-

-

... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.upto 150 mm. thick i) In ground floor including roof

15

-

939

... More
ii)1st floor

14

-

-

... More
iii)2nd floor

14

-

-

... More
iv)3rd floor

14

-

-

... More
v)4th floor

14

-

-

... More
vi)5th floor

14

-

-

... More
vii)6th floor

14

-

-

... More
viii)7th floor

14

-

-

... More
x)8th floor

15

-

-

... More
Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.

1600

-

19

... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal /Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge

240

-

166

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, as per relevant IS codes.Pakur Variety i)In ground floor

3

-

-

... More
ii)1st floor

3

-

-

... More
iii)2nd floor

3

-

-

... More
iv)3rd floor

3

-

-

... More
v)4th floor

3

-

-

... More
vi)5th floor

3

-

-

... More
vii)6th floor

5

-

-

... More
viii)7th floor

5

-

-

... More
x)8th floor

5

-

-

... More
Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire netting, I.R.C. fabric mesh or X.P. M. fitted and fixed after tying the existing reinforcement on concrete without distributing the same and with proper scarping and cleaning the reinforcement and disturbed concrete with wire brush etc. after applying a coat of cement including the cost of wire netting I.R.C or X. P. M. & cost of all handling and scaffolding complete as per direction of Engineer-in -charge. 37.5mm thick

400

-

572

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with equired bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. i)In ground floor

50

-

334

... More
ii)1st floor

50

-

-

... More
iii)2nd floor

50

-

-

... More
iv)3rd floor

50

-

-

... More
v)4th floor

50

-

-

... More
vi)5th floor

50

-

-

... More
vii)6th floor

50

-

-

... More
viii)7th floor

50

-

-

... More
x)8th floor

30

-

-

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.For works in foundation and upto roof of ground floor/upto 4 m Tor steel/Mild Steel,(SAIL/ TATA/RINL)

0.8

-

58103

... More
ii)1st floor

0.8

-

-

... More
iii)2nd floor

0.8

-

-

... More
iv)3rd floor

0.8

-

-

... More
v)4th floor

0.8

-

-

... More
vi)5th floor

0.8

-

-

... More
vii)6th floor

0.8

-

-

... More
viii)7th floor

0.8

-

-

... More
x)8th floor

0.5

-

-

... More
Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment]

270

-

782

... More
Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as per manufacturers specification. (0.4 Kg / m² of concrete surface).

400

-

309

... More
Welding in M.S. structural work with gas or electric: Continuous weld.

900

-

9

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary.[Excluding cost of chipping over concrete surface] With 1:4 cement mortar,15 mm thick plaster i)In ground floor

195

-

156

... More
ii)1st floor

195

-

-

... More
iii)2nd floor

195

-

-

... More
iv)3rd floor

195

-

-

... More
v)4th floor

195

-

-

... More
vi)5th floor

195

-

-

... More
vii)6th floor

195

-

-

... More
viii)7th floor

195

-

-

... More
x)8th floor

160

-

-

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.

100

-

34

... More
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly,complete as per manufacturer's specification and as per direction of the EIC.(One Coat) i)In Ground Floor:

400

-

3140

... More
ii)1st floor

400

-

-

... More
iii)2nd floor

400

-

-

... More
iv)3rd floor

400

-

-

... More
v)4th floor

400

-

-

... More
vi)5th floor

400

-

-

... More
vii)6th floor

400

-

-

... More
viii)7th floor

400

-

-

... More
x)8th floor

250

-

-

... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

125

-

29

... More
Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

25

-

38

... More
Protective and decorative acrylic exterior emulsion paint of approved quality and brand, as per manufacturer's specification and as per direction of EIC to be applied over acrylic primer as required . The rate includes cost of material,labour, scaffolding and all incidental chages but excluding the cost of primer. Super Protective 100% Acrylic Emulsion. Two coat i)In Ground floor

400

-

108

... More
ii)1st floor

400

-

-

... More
iii)2nd floor

400

-

-

... More
iv)3rd floor

400

-

-

... More
v)4th floor

400

-

-

... More
vi)5th floor

400

-

-

... More
vii)6th floor

400

-

-

... More
viii)7th floor

400

-

-

... More
x)8th floor

250

-

-

... More
Painting with ready mixed Black Japan of approved make and brand including smoothening surface Two coats

240

-

56

... More
Supplying, fabrication and installation of glazed aluminium windows made of Aluminium Alloy extrutions conforming to IS:732-1983 and IS:1285-1975; annodized ( with 10-12 micron thick Annodizing film and Natural white colour) (Non-annodized cleat angle for louvered window) matt finished conforming to IS: 1868-1983 for fabrication of composite sliding windows/ Louvered window, formed of basic sections of any ISI embossed/ certified make and brand as per direction of Engieer-in-charge.The rate includes cutting to proper shape and size, drilling and aliging of window, shutter frame etc. fitted with in build locking arrangements (with 100mm. Maruti lock for sliding window), fitted 2 or 3 nos. PVC roller in each shutter of sliding window for easy sliding and other necessary fittings, fixture, adhesives and joineries along with EPDM gasketing / poly sulphate sealant in between glass and shutter frame for fixing bubble free flot glass (5 mm. thick clear glass) and in between shutter and window frame whare necessary including cutting to requisite size and fixing glass as per drawing, speacification and direction of Engineer-in -charge. a)2 track sliding window i)In Ground floor

14

-

3142

... More
ii)1st floor

14

-

-

... More
iii)2nd floor

14

-

-

... More
iv)3rd floor

14

-

-

... More
v)4th floor

14

-

-

... More
vi)5th floor

14

-

-

... More
vii)6th floor

14

-

-

... More
viii)7th floor

14

-

-

... More
x)8th floor

5

-

-

... More
b)Fixed partition i)In Ground floor

10

-

3521

... More
ii)1st floor

10

-

-

... More
iii)2nd floor

10

-

-

... More
iv)3rd floor

10

-

-

... More
v)4th floor

10

-

-

... More
vi)5th floor

10

-

-

... More
vii)6th floor

10

-

-

... More
viii)7th floor

10

-

-

... More
x)8th floor

4

-

-

... More
Renewing worn out putty of glass panes : Panes exceeding 0.2 Sq.m but not exceeding 0.5 Sq.m

100

-

51

... More
Closing gap between door and window frame and jambs with cement mortar (1:3) including removing old mortar (throughout entire surface of contact) and cleaning the joint. (Cement 0.012 Cu.m/100 Mtr.) (This item is not payable for new works).

500

-

1091

... More
Removing loose scales, blisters etc. from old painted surface and thoroughly smoothening the surface to make the same suitable for receiving fresh coat of paint

1650

-

21

... More
Mazdoor (Male)

60

-

245

... More
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). Sal : Local.(8th floor)

1.4

-

-

... More
Z-batten shutters of door and window as per design havings tongued and groovehalf lap jointed as per direction of the Engineer-in-Charge including fitting and fixing shutter in position, but excluding the cost of hinges and other fittings in 8th floor. Shutter with 25mm thick planks, 19mm thick battens.Sishu, Gamar, Champ, Badam, Bhola, Morga, Hallak.

11

-

-

... More
Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark. 100mm. X 58mm. X 1.90mm

32

-

47

... More
Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16mm dia rod with centre bolt and round fitting. 300mm long

4

-

166

... More
Anodised aluminium barrel / tower / socket bolt (full covered) of approved manufactured from extruded section conforming to I.S. 204/74 fitted and fixed with cadmium plated screws:100mm long x 10mm dia. bolt.

4

-

53

... More
Anodised aliminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 230/72) fitted and fixed complete. 125 mm grip x 10 mm dia rod.

8

-

95

... More
Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket,bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) 20 mm dia. medium quality

60

-

240

... More
Supplying and laying true to line and level 20 mm / 25 mm. thick precast roof tiles made of cement conc. with stone chips as per approved strength and density set in 25mm avg. thick cement morter(1:3) and filling up joint (3 mm wide) with cement sand mortar (1:1) applying cement slurry @ 1.75 kg per Sq.m back of tiles and then settting close the precast tiles, finishing up the joints with slurry already laid and finally finishing the top surface including providing 150 mm. high skirting with the same tiles flushed with the inside surface of parapet wall,finishing the mouth of rain water pipes, curving etc. as necessary complete as per direction of the Engineer-in-charge. (Levelling if necessary may be paid separately) For 25 mm. thick precast tiles (cement 14.6 kg/ Sq.m for underlayer) 8th. Floor

380

-

-

... More
G.S.T @12% for the items from Sl no. 1 to 32 on Rs. 4826629.77

1

-

579195.58

... More
Labour welfare cess @1% from Sl no. 1 to 33 on Rs. 5405825.35

1

-

54058.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.