Howrah Improvement Trust Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Howrah Improvement Trust - HIT Tender
Eprocure
Opening Date16 Aug 2018
Closing Date29 Aug 2018
Tender Amount₹ 6,97,537 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 14,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_HIT_186461_12Bid Award Id
ViewTender No
HIT/CE/5B/2018-19Tender Authority
Howrah Improvement Trust ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Reinforcement for reinforcement concrete work in all sorts of structures including distribution bars, stirrups, binders, etc. including supply of rods, initial straightening and removal of loose rust (if necessary) cutting to requisite length, hooking and
bending to correct shape, placing in proper position and bending with 16 guage black annealed wire at every intersection, complete as per drawing and direction.
(a) In foundation, basement and upto roof of ground floor/upto 4 M.
Tor steel / Mild steel.
0.7
-
58103
... More
Brick work with first class bricks in cement motar (1:4).
In foundation and plinth.
10
-
5483
... More
Supplying ready mixed concrete of M 20 Grade with well graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled
condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work, compacting and curing the same complete as per specification &
direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. [Cement to be supplied by the Manufacturer or supplier
65
-
6664.69
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4M. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting & fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mmm shuttering without staging in foundation
-
-
209
... More
Plaster (to wall, floor, ceiling etc) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary (G.F.)[excluding cost of chipping over concrete surface]
15mm thick 4:1.
90
-
156
... More
Neat cement punning about 1.5mm thick in wall dado, window sills, floor, drain etc.
-
-
34
... More
Providing construction Joint at Concrete road with 12mm thick Thermokal Board in position including cutting to requisite size and shape all complete as per direction of Engineer -in -Charge.
20
-
114.84
... More
Dismantling R.C. floor, roof, beams etc. Including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof.
4
-
1956
... More
Removal of rubbish,earth etc. from the working
site and disposal of the same beyond the
compound, in conformity with the Municipal /
Corporation Rules for such disposal, loading into
truck and cleaning the site in all respect as per
direction of Engineer in charge
5
-
166
... More
GST 12% on Item 1 to 12 73996.21
1
-
73996.21
... More
CESS 1% on item 13 6906.31
1
-
6906.31