Housing Directorate Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Housing Directorate Tender
Civil And Construction
Building Construction
Eprocure
Opening Date9 Sep 2024
Closing Date27 Sep 2024
Tender Amount₹ 2,25,831
Costs
EMD
₹ 4,517Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbhousing/ee/kn-i Divn/e-nit 04 Of 2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HSD_747467_1Bid Award Id
ViewTender No
WBHOUSING/EE/KN-I DIVN/e-NIT 04 OF 2024-25Tender Authority
Housing Directorate ViewPurchaser Address
-Website
http://https://wbhousing.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
French polishing to wood work including preparing surface (ordinary gloss)
(a) On new wood work
25.54
11927
467
Brick work with 1st class bricks in cement mortar (1:6)
(b) In superstructure, ground floor
0.84
4696
5591.06
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht.
shall be allowed under 12 (e) for every 4 m or part thereof)
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of
Engineer-In-Charge.
6.3
2111
335
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and
removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
II. Other than
SAIL/ TATA/RINL
0.06
2645
47920.41
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor
as per relevant IS codes.
(i) Pakur Variety
0.72
4171
5792.57
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding /staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar
10.38
1783
171.73
Supplying, fitting & fixing granite slabs 15mm to 18 mm. thick with uniform texture & without decorative veins in columns, wall, facia,rise etc. with 15 mm thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass / copper hooks including pointing in
cement mortar (1:2) (1 white cement : 2 marble dust) with admixture of pigment matching the stone shades all complete as per direction of the Engineer-in-charge including cost of all
materials, labours, scaffolding, staging, curing and
roughening of concrete surface complete.
[Using cement slurry at back side of granite @ 4.4 kg/sq.m & white cement slurry for joint filling @ 1.8 kg/sq.m] In ground floor
(a) Area of each Granite slab 0.6 to 1.0 Square meter.
9.12
26694
2926.95
Labour for Chipping of concrete surface before taking up Plastering work.
6.3
132
21
Extra cost of labour for prefinished and premoulded Nosing to treads of steps, railing, window sill etc. of Marble Stone.
13.2
3406
258
Sub Total
-
-
-
GST 18%
1
34108
34108
CESS 1%
1
2236
2236
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements