Housing Directorate Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Housing Directorate Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date6 Jan 2025
Closing DateCancelled
Tender Amount₹ 2,38,240
Costs
EMD
₹ 4,765Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbhsd/ee/med/enit-06/2nd Call/24-25/2
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HSD_795283_2Tender No
WBHSD/EE/MED/eNIT-06/2nd Call/2024-25Tender Authority
Housing Directorate ViewPurchaser Address
-Website
http://https://wbhousing.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Second floor
0.74
2056
1528
... More
Third floor
0.65
2106
1363
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
1.41
5653
7988
... More
First floor
0.49
5748
2799
... More
Second floor
0.54
5843
3138
... More
Third floor
0.65
5938
3842
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. Ground floor
0.11
55458
6150
... More
First floor
0.04
55888
2135
... More
Second floor
0.04
56318
2377
... More
Third floor
0.05
56748
2883
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
20.39
324
6606
... More
First floor
8.65
342
2958
... More
Second floor
9.45
360
3402
... More
Third floor
11.27
378
4260
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (a) 15 mm. thick plaster with sand & cement mortar (1:6)
136.15
136
18591
... More
First floor
116.7
140
16402
... More
Second floor
116.7
144
16869
... More
Third floor
136.15
148
20225
... More
(b) 10 mm. thick plaster with sand & cement mortar (1:4)
Ground floor
32.24
122
3951
... More
First floor
16.5
126
2088
... More
Second floor
18
130
2350
... More
Third floor
21.45
134
2886
... More
Welding in M.S. structural work with gas or electric:
(b) Continuous weld.
40.6
9
365
... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc.
I) For structural members of specified sections weighing less than 22.5 Kg./m
0.6
59119
35471
... More
Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work).
15.5
896
13888
... More
Add GST @ 18% on Sl. No. 1 to 9
1
35982
35982
... More
Add LW CESS @ 1%
1
2359
2359
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements