Gorkhaland Territorial Administration Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Gorkhaland Territorial Administration - GTA Tender
Eprocure
Opening Date30 Aug 2018
Closing Date19 Sep 2018
Tender Amount₹ 1,85,13,322
Costs
EMD
₹ 3,70,266Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_GTA_188294_1Bid Award Id
ViewTender No
07/EE/AED/KPG/GTA/2018-19Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
UPGRADATION OF ROAD FROM BURMAIK DO BUNGLOW TO LOWER BURMAIK PRIMARY SCHOOL, UNDER 39TH. RAMPOO MUNSONG CONSTITUENCY, KALIMPONG, G.T.A UPTO CARPETING STAGE, DISTANCE 2.00KM.
UPGRADATION OF ROAD FROM BURMAIK DO BUNGLOW TO LOWER BURMAIK PRIMARY SCHOOL, UNDER 39TH. RAMPOO- MUNSONG CONSTITUENCY, KALIMPONG, G.T.A (UPTO CARPETING STAGE, DISTANCE 2.00KM.)
BOQ Items
... More
(iii) without pumping out water but including shoring as required.
1536.24
-
130.09
... More
Hand Packed rough dressed stone walls by masons with hard stones from approved quarries including all carriage of materials to site
659.12
-
2774.61
... More
Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site (a) In Road and Jhora Work
979.66
-
5075.47
... More
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion
129.01
-
4484.98
... More
Labour for laying 150 mm to 225 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all
joints with sandy clay or earth.
9212
-
381.51
... More
Labour for laying stone edging with departmental stone materials laid to correct line and level including carriage of departmental stone materials within a lead of 150 metres cutting necessary trench in soil or in hard metalled surface, laying the stones and repacking the trench on both sides of the edging with spoils and ramming the same thoroughly.
-
-
-
... More
(b) 100 mm wide and 250 mm deep edging with stone sets laid-on-edge.
4400
-
77.88
... More
Filling properly the empty sausage crates with
boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire
(passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge.
[Rate provided is inclusive of the cost of stone
boulders and sausage crate]
90
-
3416.46
... More
(II) Cement concrete with 30 mm down graded shingles excluding shuttering.
-
-
-
... More
N.B. Variety (a) 1:3:6 proportion
107.44
-
6255.08
... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of
plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain
etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
-
-
-
... More
(b) Where staging is not required.
1036.97
-
242.08
... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of
plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain
etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
-
-
-
... More
(b) Where staging is required.
62.09
-
400.45
... More
Supplying, fitting and placing HYSD bar
reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.
-
-
-
... More
(a) For M.S. Rounds/Tor Steel/H.Y.S.D. Bars.
1.18
-
58172.4
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in
uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
-
-
-
... More
(a) M-15 Grade (Using concrete mixer)
10
-
6769.58
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. A) Granular material
244.2
-
3285.32
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in
uniform thickness, hand packing, rolling wit vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width oN each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Work of MoRT&H (5th Revision).
-
-
-
... More
(iii) Grading-II Aggregate (53 mm to 22.4 mm) Using Stone Screening Type B (11.2 mm). (B) Using manual means:.
602.25
-
3182.69
... More
Providing and applying bituminous Primer Coat for priming of base course with Cationic bituminous emulsion of approved grade and requisite quantity including preparation of surface to be primed, through cleaning and sweeping, uprooting weeds,grass etc.dampening the surface beforeh and spraying the primer using sprayer mounted on distributor truck or with hand sprayer using mechanical pump including cost and carriage of bitumen emulsion and all other incidental costs of work.
-
-
-
... More
(b) For surfaces with medium porosity @ 10.5 kg/ 10m2.
8030
-
36.79
... More
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including
cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
-
-
-
... More
(ii) On Granular surfaces treated with primer (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.)
8030
-
12.94
... More
Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by any suitable arrangements, laying the mixture uniformly over the surface, including line, grade and level to serve as wearing course on a previously prepared base, including mixing in Mobile Hot Mix Plant (Light Duty) and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the
aggregates to required temperature and including the hire charges of Mobile Hot Mix Plant (Light Duty) and other machinery, pay of operators, cost of fuel and lubricants etc. complete to be followed by seal
coat of either Type A or Type B as per Technical Specification Clause 508 for Rural Roads of MORD.
8030
-
137.48
... More
Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating
and mixing cleaned sand/grit (100 % assing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and preading
the mix at an uniform rate using suitable means, brushing the surface, if ecessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and
aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction
and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
-
-
-
... More
II By Manual Means
With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.)
8030
-
48.7
... More
Spreading of sand over the bituminous surface @ 0.003 m3 per m2 of surface from the road side stacks and carriage of the same up to a distance of 150 m from stack complete including cost of sand.
8030
-
3.77
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
-
-
-
... More
(ii)with (4:1) cement mortar. (b) 15mm thick plaster.
2142.66
-
238.91
... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
1863
-
46.15
... More
(b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
59.16
-
51.58
... More
Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with
approved synthetic enamel paint.
-
-
-
... More
(b) Two coats.
59.16
-
111.99
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements