Higher Education Department Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Higher Education Department - DHE Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date17 Jan 2024
Closing Date31 Jan 2024
Tender Amount₹ 8,32,256 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
In 1st Floor

0.09

413

4598.09

... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) In Ground Floor

14.22

9474

666.27

... More
In 1st Floor

0.96

651

678.27

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar (b)15 mm thick plaster In Ground Floor:

442

67674

153.11

... More
In 1st Floor

15

2356

157.11

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. (b) River bazree

37.16

141948

3819.92

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work.

340

123420

363

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary: (a) On timber or plastered surface: With super gloss (hi-gloss) – (iv) Two coats (with any shade except white)

86.66

7019

81

... More
(b) On steel or other metal surface: With super gloss (hi-gloss) – (iv) Two coats (with any shade except white)

14.91

1177

79

... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

6.81

197

29

... More
Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

30.68

1165

38

... More
Stripping off worn out plaster and raking out joints of walls, ceilings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.

11.6

220

19

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE: Cement 0.152 cu.m per100 sq.m

442

15028

34

... More
Supplying, fitting & fixing of 2-Track / 3-Track Aluminum sliding Window of all Aluminum sections viz. window frame (top, bottom & side frame), shutter (top, bottom, side & interlock member) made of aluminum alloy extrusions conforming to IS 733-1983 & IS 1285-1975, anodized conforming to IS 1868-1983, fitted with all other accessories viz. PVC roller, EPDM gasket, maruti lock, screws etc. including labour charges for fitting & fixing of aluminum 2-track/3-track sliding window with fixing of glass (excluding cost of glass) all complete as per architectural drawings and direction of Engineer-in-charge. 10-12 Micron thickness Anodizing film Natural white For 2-Track window: Members for Bottom frame @ 0.875 Kg per Mtr. and for Top and Side frame @ 0.778 Kg per Mtr. and for shutter Bottom and Top member @ 0.472 Kg per Mtr., Style side member @ 0.493 Kg per Mtr. and Interlock member @ 0.612 Kg per Mtr. For 3-Track window: Members for Bottom frame @ 1.233 Kg per Mtr. and for Top and Side frame @ 1.067 Kg per Mtr. and for shutter Bottom and Top member @ 0.472 Kg per Mtr., Style side member @ 0.493 Kg per Mtr. and Interlock member @ 0.612 Kg per Mtr. [Note : for estimate purpose construction wing may consider weight of 2- track Aluminum window @ 5.5 Kg per Sq.M. and 3-track Aluminum window @ 6.5 Kg per Sq.M]

19.8

8870

448

... More
Supplying bubble free float glass of approved make and brand conforming to IS: 2835-1987. (i) 4mm thick clear glass.

12.06

4799

398

... More
Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothing of surface. Two Coats

622.51

43575

70

... More
Supplying, fitting & fixing of Aluminum fixed partition wall of all aluminum sections viz top, bottom and side member, intermediate member, glazing clip made of Aluminum Alloy Extrusions conforming to IS: 733-1983 and IS: 1285-1975, anodized conforming to IS:1868- 1983, fitted with all other accessories viz. EPDM gasket, cleat, angle screws etc. including labour charges for fitting and fixing of aluminum fixed partition wall with glass / panel board all complete as per architectural drawings and direction of Engineer-in-charge. (Excluding cost of glass/ panel board, 10-12 Micron thickness Anodizing film. Natural white. (a) for unsupported length of vertical member upto 1.50m. height of both ends of vertical member restrained but panel within 0.90 sqm (unit wt of Top, bottom & side member @1.366 kg/m ; intermediate member @ 1.443 kg/m; glazing clip: 0.167 kg/m respectively) [Note : for estimate purpose construction wing may consider weight of Al-Sections for Partition wall @ 5.7 Kg per Sq.M]

69.88

27323

391

... More
Providing, fitting and fixing in position, medium density fiber board conforming to IS: 12406-1988 for plain and IS: 14587-1998 for pre laminated made of wood fiber bonded with Urea formaldehyde for interior grade and Phenol Formaldehyde for exterior grade conforming to per IS:848-1974 as per approved make and brand as per direction of Engineer-in-Charge. In Ground Floor (ii) Both side decorative laminate (b) Interior Grade 9mm thick

4.56

3980

873

... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. a) upto 150 mm. thick In Ground floor

31.95

30001

939

... More
In 1st Floor

0.21

210

989

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16-gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. JSW/JSPL/SRMB/SHYAM…..SSL

0.1

5825

58250.5

... More
Supplying Aluminum casted body hydraulic door closer as per I.S.I.

3

1905

635

... More
(C) Supplying Heavy Duty Aluminum Handle (EBCO Type) (Natural White)

4

384

96

... More
(D) Supplying Aluminum casted body Butt Hinge (KOBRA type). (Natural white)

8

440

55

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.

61.2

7299

11927

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.

61.2

4745

7754

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

127.5

41310

324

... More
Supplying, fitting & fixing of partly glazed partly paneled or fully glazed single leaf Aluminum swing door of all aluminum sections viz door frame ( top and side frame), shutter( top rail, bottom rail, lock rail, door vertical) , glazing clip made of Aluminum Alloy Extrusions conforming to IS: 733-1983 and IS: 1285-1975, anodized conforming to IS:1868- 1983, fitted with all other accessories viz. EPDM gasket, cleat, angle screws etc. including labour charges for fitting and fixing of aluminum door with door spring,/aluminum hinges, glass / Panel board all complete as per architectural drawings and direction of Engineer-in charge. (Excluding cost of glass/ panel board, door spring/ Al hinges, door closer, door stopper, handle, tower bolt and locking arrangement etc.) 10-12 Micron thickness Anodizing film Natural White Kg. 385 385 385 385 385 385 385 385 385 385 385 394 385 385 385 (unit wt of to Top & side frame @1.366 kg/m ; top rail @ 1.296 kg/m; bottom rail @ 1.974 kg/m; lock rail @ 1.590 kg/m; door vertical @ 1.412 kg/m; glazing clip @ 0.167 kg/m. ) [Note : for estimate purpose construction wing may consider weight of Aluminum door @ 9.0 Kg per Sq.M]

22.5

8662

385

... More
Supplying, fitting & fixing best quality digital printed Ceramic tiles in coloured decorative on walls and floors to match with the existing work & 4 nos. key stones (10mm) fixed with adhesive 4.5 mm thick at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. With polymerized adhesive and epoxy grout pointing including spacer - 2mm (When tiles are laid over existing hard ready surface) all complete as per direction of Engineer-in-charge In Ground Floor

22.68

24040

1060

... More
In 1st Floor

15

16080

1072

... More
Supplying, fitting and fixing White Vitreous China Sink in position on C.I. brackets including two coats of painting of brackets. (a) Plain edge sink with overflow (ii) 610 mm X 450 mm X 250 mm

2

10890

5445

... More
Supplying solid flush type doors of commercial quality, the timber frame consisting of top and bottom rails and side styles of well-seasoned timber 65mm wide each and the entire frame fitted with 37.5mm wide battens places both ways in order to make the door of solid core and internal lipping with Garjan or similar wood veneers using phenol formaldehyde as glue etc. complete, including fitting, fixing shutters in position but excluding the cost of hinges and other fittings in ground floor. (b) 32 mm thick shutters (single leaf) In 2nd Floor

2.52

6771

2687

... More
Supplying, fitting & fixing granite slab 15mm to 18mm thick in floor, lobby, stair, landing and treads etc. over 20mm (avg.) thick base of cement mortar (1:2) laid with white cement slurry @ 4.40Kg per Square meter before placing of granite and jointed with white cement slurry @ 2.0 Kg per square meter with necessary pigments and complete as per direction of Engineer-in-charge including cost of all materials, labours, curing and roughening of concrete surface complete. (c) Area of each Granite slab above 1.00 Square meter In 2nd Floor

9.15

27733

3031

... More
Supplying, fitting and fixing boiling water proof ply conforming to IS: 710-1977 bonded with phenol formaldehyde synthetic resin conforming to IS: 848-1974 of approved make and brand fitted and fixed as per design as per approval and direction of Engineer-in-Charge. [excluding the cost of supporting frame work and teak wood batten/Lipping] (vi) 19mm In 2nd Floor

4.5

11016

2448

... More
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame excluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be corrected up to three decimals). (c) Sal: Local. In Ground Floor

0.03

2372

71907

... More
In 1st Floor

0.04

2595

72107

... More
Supplying best Indian sheet glass panes set in putty and fitted and fixed with nails and putty complete. (In all floors for internal wall & upto 6 m height for external wall) (i) 4 mm thick (weighing 7.4 kg/Sq.m)

6

3216

536

... More
Glazed shutters of doors, windows, fan light, clerestory windows etc. as per design (with ordinary glass of 7.4kg./sq.m. 3mm. Thick) fitted with putty bed and teak wood bead and nails including fitting and fixing shutter in position but excluding the cost of hinges and other fittings. cost of glass, putty, wooded beads etc. will be paid separately. (ii) 35mm thick shutters. (b) Gamar, In Ground Floor.

6

15852

2642

... More
Supplying, fitting and fixing windows and ventilators with or without integrated grills conforming to IS 1038-1975 and manufactured from rolled steel sections conforming to IS 7452-1974 with non-friction projecting type, box type hinges, glazing clips, lugs locking bracket, handle plate etc. including hoisting in position, straightening if required, fixing lugs in cement concrete (1:2:4) with stone chips 20 mm down cutting holes and mending good damages to match with existing surface complete in all respect excluding glazing. (Add extra @ 1.2 % for each additional floors upto 4th floor and @ 1.5% for each addl. Floor above 4th floor.) In Ground floor Flash butt welded windows and ventilators (No shop priming will be allowed to facilitate inspection of workmanship) Without integrated grills. (b) Openable steel windows as per IS sizes with side hung shutters and horizontal glazing bars. [The extra rate admissible for the openable portion only] (c) Extra over item no. 20 (a) and (b) for, (viii) M.S. integrated grill as per approved design integrated with steel window or ventilator, joints continuously welded with M.S. flats and bars.

15.36

1459

95

... More
Supplying, fitting and fixing bibcock or stop cock. (a) (ii) Chromium plated Bib Cock long body with wall flange with aerator (Equivalent to Code No. 512 & Model - Tropical / Smoothing Special of ESSCO or similar brand)

2

1318

659

... More
Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS: 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbow, nipple, long screw, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the center line measurements of total pipe line including all specials. No separate payment will be made for accessories, specials. Payment for painting will be made separately) (a) For Exposed Work PVC Pipes 50 mm

7

2688

384

... More
Add GST @ 18.00 %

1

125697

125697.29

... More
Add L W Cess @ 1.00%

1

8240

8240.15



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.