Gorkhaland Territorial Administration Tender
... More
The GTA has issued a formal invitation for competitive bids for the Gorkhaland Territorial Administration project, for Repairing Of Boulder Soling Road From Soreng Ground Fatak To Lower Soreng, Under R.r. Block, Gta in Darjeeling, West Bengal, with an estimated contract value of Rs. 17,10,857. The bid opening date for this tender is 11-02-2021 and the last date for bid submission is 26-02-2021. Interested bidders for Gorkhaland Territorial Administration tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Gorkhaland Territorial Administration - GTA Tender
Eprocure
Opening Date11 Feb 2021
Closing Date26 Feb 2021
Tender Amount₹ 17,10,857
Costs
EMD
₹ 34,217Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_GTA_325676_2Bid Award Id
ViewTender No
GTA/EE/ TED / NIeT-22( 1st Call)/e-Tender/2020-2Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site
15.36
-
5075.47
... More
Hire and labour charges for Shuttering with or
without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. b) Where staging is not required.
24.8
-
242.08
... More
CROSS DRAINAGE WORKS 600 DIAMETER HUME PIPE Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with pproved material complete as per direction of the ngineer-in-Charge .
9.6
-
128.96
... More
Protective Works Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of enches,levelling, dressing and ramming the bottom,bailing out water as required complete. a) depth of excavtion not exceeding 1,500 mm
0.33
-
13491.82
... More
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. .
66
-
377.82
... More
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
3600
-
72.4
... More
hand packed rough dressed stone work with boukder including all coast complete
1.48
-
2774.61
... More
Stone filling on the backside of the walls,aboutment, wingwalls etc. inculding hand packing and carrige and cost of stone Behind abut. Both side Top of H/pipe
7.68
-
2600.03
... More
Cost of RCC spun pipe (NP 3) diameter 600 mm
9.6
-
3460.73
... More
Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse gregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & inforcement works.(a) M-15 Grade
2.8
-
6705.11
... More
Cost of stone boulder 150 mm size delivered ans stacked at site.
540
-
1726.67
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements