Gorkhaland Territorial Administration Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Gorkhaland Territorial Administration - GTA Tender
Civil And Construction
Building Construction
Eprocure
Opening Date21 Nov 2024
Closing Date28 Nov 2024
Tender Amount₹ 3,38,379
Costs
EMD
₹ 6,768Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Niet No 15/15thcfc And 5th Sfc/pokhriabongiii Gp
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GTA_771526_1Bid Award Id
ViewTender No
NIeT No 15/15thCFC and 5th SFC/PokhriabongIII GPTender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.
0.29
6370
1847.53
... More
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.
1.62
7238
11726.21
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
0.15
79822
12180.96
... More
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
20.25
400
8116.2
... More
Rubble masonry in cement (1:4) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site
9.12
4728
43119.36
... More
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
25.74
247
6362.93
... More
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
25.74
40
1050.19
... More
Labour for fitting and fixing high density poly-ethylene pipes or P.V.C. pipes for above ground work including costs of jointing materials, paints etc.fitting and fixing all necessary specials, cutting pipes, making threads, cutting holes in walls of R.C. floor where necessary and mending goods all damages excluding the cost of masonry or concrete work, if necessary ,but including the cost and fitting and fixing holder bat clamps(any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineer-in-charge.(Payment will be made on center line measurment of the total pipeline including specials.) .
1380
48
67399.2
... More
Supply of High Density Poly-ethylene Pipe conforming to IS-4984-1985 (Dia)[PE-63].
1380
95
131155.2
... More
18% GST
1
51106
51106.08
... More
1% CESS
1
3350
3350.29