Gorkhaland Territorial Administration Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Gorkhaland Territorial Administration - GTA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date11 Nov 2024
Closing Soon25 Nov 2024
Tender Amount₹ 7,51,923 
Notes
Download

Costs

Summary

Construction Of Bitumenous Road From Nabin Pradhan House Towards Younis Tamang House At Nepania Under 15th Cfc (untied)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.

154.86

50

7743

... More
Cost of stone boulder 150 mm size delivered and stacked at site.

23.23

1526

35458.27

... More
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.

52.7

6370

335741.16

... More
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).

30

400

12024

... More
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H 5th Revision).(iv) For Construction of Sub Base by compacting river bed materials.

70.2

1029

72258.26

... More
Water Bound Macadam Base Course, Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with vibratory roller 8-10 tonnesin stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate,watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting orfilling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404of Specifications for Road & Bridge Works of MoRT&H(5th Revision).Grading-I Aggregate (63 mm to 45 mm) Using Stone Screening Type A (13.2 mm)

17.55

1633

28675.82

... More
Water Bound Macadam Base Course, Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with vibratory roller 8-10 tonnesin stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate,watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting orfilling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404of Specifications for Road & Bridge Works of MoRT&H(5th Revision) Grading-II Aggregate (53 mm to 22.4 mm) Using Stone Screening Type B (11.2 mm)

17.55

1965

34493.82

... More
Prime Coat Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including costand carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H(5th Revision).

351

31

11084.58

... More
Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete asper Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).

351

11

3906.63

... More
Open Graded Premix Surfacing with Cationic Bitumen Emulsion using 13.2 mm (@ 0.018 m3/m2)and 11.2 mm (@ 0.009 m3/m2) size stone aggregates,premixed with Cationic Bituminous Emulsion (M.S.grade) conforming to IS : 8887-1970 @ 21.5 kg per 10m² of surface, including cleaning, moistening thesurface, applying tack coat with cationic bitumen emulsion, screening, cleaning and washing the stonechips, intimately mixing with emulsion using Concrete Mixer, laying the mixture uniformly over the surface and rolling with power roller after hand packing and pinning adequately to ensure a compact surface all complete as per specification and direction of theEngineer-in-charge including cost and carriage of stone materials and emulsion, including cost of labour, hireand running charges of road roller and other tools and plants and cost of all other incidental charges includinghire charges and cost of fuel and lubricants of machineries and equipment for construction and quality control as per Technical

351

130

45812.52

... More
Providing and laying Liquid Seal Coat (Type A) with approved quality stone chips and bitumen binder on thoroughly cleaned black top surface, spreading screened & cleaned stone aggregates (100 % passing through 11.2 mm sieve and retained on 2.36 mm sieve)uniformly @ 0.09 m3 of dry aggregate per 10 m2 of area using suitable means, brushing the chips, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and stone chips, cost of heating the binder and all other incidental charges, cost of fuel and lubricants,including hire charges of machineries, tools & plants required for construction and quality control completeas per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).

351

57

20143.89

... More
Spreading of sand over the bituminous surface @0.003 m3 per m2 of surface from the road side stack sand carriage of the same up to a distance of 150 m from stack complete including cost of sand.

351

4

1446.12

... More
Display board

1

2000

2000

... More
Add 18 % GST on Total Amount

0.18

630914

113564.56

... More
Add 1%labour cess on (Total Amount + GST)

0.01

744478

7444.79



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.