Gorkhaland Territorial Administration Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Gorkhaland Territorial Administration - GTA Tender
Eprocure
Opening Date20 Jun 2019
Closing Date4 Jul 2019
Tender Amount₹ 43,97,172 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 87,996Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_GTA_229279_1Bid Award Id
ViewTender No
NieT58/EE/MED/GTA/2019-20Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Seal Coat Providing and laying Liquid Seal Coat (Type A) with approved quality stone chips and bitumen binder on thoroughly cleaned black top surface, spreading screened & cleaned stone aggregates (100 % passing through 11.2 mm sieve and retained on 2.36 mm sieve) uniformly @ 0.09 m3 of dry aggregate per 10 m2 of area using suitable means, brushing the chips, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and stone chips, cost of heating the binder and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
4777.5
-
45.62
... More
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a)upto 30 depth iv) Without pumping out water and shoring
121.9
-
128.96
... More
Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site
51.77
-
5075.47
... More
Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. [
78.75
-
2770.8
... More
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
71.016
-
4484.98
... More
Providing formwork and staging including hire and labour charge for abutment and its components and retaining wall and its components for height upto 3 mtr clear span including stripping off and removing after completion of work as per specification and direction b)for portion of Ht above 1m and upto 3m
118.44
-
242.08
... More
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications
48
-
132.35
... More
Earth in filling in foundation trenches and at the back of abutments with good earth (sandy soil) in layers not exceeding 15 cm. including watering and ramming layer by layer complete with earth obtained by fresh excavation from land arranged by Department beyond 150 m. but within 300 m. including all lifts. Earth to be approved by the Engineer-in-charge.
81.57
-
182.12
... More
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a)upto 30 depth iv) Without pumping out water and shoring
225.42
-
128.96
... More
Hand Packed rough dressed stone walls by masons with hard stones from approved quarries including all carriage of materials to site
61.62
-
2774.61
... More
Providing and laying cement concrete M20 (1:2:4) with or without reinforcement in steming of well and well cap,abutment and superstructure of bridge and culvert with graded stone chips of appripriate nominal size including screening and cleaning of coarse aggregate and sand as necessary,curing in water,including cost and carriage of materials to work site and other necessary charge all complete,but excluding cost of labour and materials for formwork and reinforcement.
28.51
-
5776.21
... More
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a)upto 30 depth iv) Without pumping out water and shoring
156
-
128.96
... More
Hand Packed rough dressed stone walls by masons with hard stones from approved quarries including all carriage of materials to site
64.48
-
2774.61
... More
Providing and laying cement concrete M20 (1:2:4) with or without reinforcement in steming of well and well cap,abutment and superstructure of bridge and culvert with graded stone chips of appripriate nominal size including screening and cleaning of coarse aggregate and sand as necessary,curing in water,including cost and carriage of materials to work site and other necessary charge all complete,but excluding cost of labour and materials for formwork and reinforcement.
26.26
-
5776.21
... More
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a)upto 30 depth iv) Without pumping out water and shoring
101.47
-
128.96
... More
Providing and laying cement concrete M20 (1:2:4) with or without reinforcement in steming of well and well cap,abutment and superstructure of bridge and culvert with graded stone chips of appripriate nominal size including screening and cleaning of coarse aggregate and sand as necessary,curing in water,including cost and carriage of materials to work site and other necessary charge all complete,but excluding cost of labour and materials for formwork and reinforcement.
7.97
-
5776.21
... More
Providing formwork and staging including hire and labour charge for abutment and its components and retaining wall and its components for height upto 3 mtr clear span including stripping off and removing after completion of work as per specification and direction Form work so as to give smooth concrete finish with timber planks not less then 38mm thick.
13.5
-
400.44
... More
Providing formwork and staging including hire and labour charge for abutment and its components and retaining wall and its components for height upto 3 mtr clear span including stripping off and removing after completion of work as per specification and direction foundation concrete works for walls,parapets etc.
23.66
-
242.08
... More
Providing formwork and staging including hire and labour charge for abutment and its components and retaining wall and its components for height upto 3 mtr ,abutment
244.16
-
242.08
... More
Providing and laying Design Mix concrete for reinforced work in any part of bridge...all complete
4.666
-
8183.53
... More
Supplying,fitting and placing HYSD bar reinforcement in Bridge Super-Structure including initial straightening,straightening of coils bars,removal of loose rust (if any),cutting to requisite length bending,binding with annealed wire not less than 1mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading,unloading,carriage of all steel materials complete as per drawing and technical specifications
0.538
-
71237.33
... More
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
113.716
-
4484.98
... More
Plaster( to wall, floor. Ceiling etc) with sand and cement mortar including rounding of f or chamferring corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary ( Ground floor) (Excluding cosat of chipping over concrete surface) (ii) With 1:4 cement mortar (b) 15 mm thick plaster
23.292
-
238.91
... More
Stone filling on the backside of the walls,abutments,wingwalls etc. Including hand packing and carriage and cost of stone.
18.15
-
1922.66
... More
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications
24
-
132.35
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements