Gorkhaland Territorial Administration Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Gorkhaland Territorial Administration - GTA Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Feb 2025
Closing Date15 Feb 2025
Tender Amount₹ 2,99,478
Costs
EMD
₹ 5,990Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_GTA_813054_2Tender No
PR/GBN-I_GP/e-NIT /06(15CFC)/2024-25Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.
2.61
6370
16627.79
... More
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.
0.96
7238
6948.86
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
0.11
75332
8286.56
... More
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
19.2
400
7695.36
... More
Galvanized corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugaion minimum side lap. ( payment to be made on area of finished work). (GCI sheet to be supplied by contractor).
29.14
1004
29268.22
... More
M.S. structural works in roof trusses with tubular sections
conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one
another with bracket, gusset cleats as per design, direction of
Engineer-in-charge complete including cutting to requisite size,
fabrication with necessary metal arc welding conforming to IS: 816-
1969 & IS: 9595 using electrodes of approved make and brand
conforming to IS:814- 2004, haulage, hoisting and erection all
complete.
The rate includes the cost of rolled steel section, consumables such
as electrodes, gas and hire charge of all tools and plants and labour
reqired for the work including all incidental chages such as
electricity charges, labour insurance charges etc.
Payment to be made on the basis of calculated weight of structural
tubular memebrs as specified in relevent IS code in finished work.
Payment for gusset, bracket, cleat may be made by adding the actual
weight of such items with weight of finished structural members. The
rates are considered for a height of erection 8 m. / 2nd floor level
from the ground. Add 1.5 % extra over the rate for each additional
floor or 4m. beyond the initial 8 m. or part thereof.
0.5
74029
37014.6
... More
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
26.86
3964
106494.53
... More
GST @ 18%
1
45230
45230.81
... More
Cess @ 1.0%
1
2965
2965
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements