Gorkhaland Territorial Administration Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Gorkhaland Territorial Administration - GTA Tender
Civil And Construction
Building Construction
Eprocure
Opening Date12 Dec 2024
Closing Date23 Dec 2024
Tender Amount₹ 3,01,823
Costs
EMD
₹ 6,036Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GTA_783847_3Bid Award Id
ViewTender No
25/SGP/15th CFC/2024-25Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cement Concrete with graded stone chips(30 mm size excluding shuttering in ground floor and foundation (a) 1:3:6 proportion ement Concrete with graded stone chips(30 mm size excluding shuttering in ground floor and foundation
2.75
6025
16584.36
... More
Ordinary Cement Concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any in ground floor as per relevant IS Codes.
3.71
7035
26099.97
... More
Reinforcement for reinforced concrete in all sorts of structures including distribution bars,stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction
0.44
72265
31567.1
... More
Hire labour charges for Shuttering with hard wood for precast RC Slab curved or straight, and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc. complete in all respect. (Only the area in contact to concrete to be measured)
39.01
400
15635.21
... More
Plaster to (wall floor ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and racking out joints including throating, nosing and drip course scaffolding /staging, where necessary (Ground floor). Excluding cost of chipping over concrete surface.
39.01
261
10205.02
... More
M.S. structural works in roof trusses with tubular sections
conforming to IS: 806-1957 & IS: 1161- 1958 cnnected to one
another with bracket, gusset cleats as per design, direction of
Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1956 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete.The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a height of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. i) For trusses spanning up to 12.00 m
0.9
74029
66626.28
... More
Galvanised corrugated iron sheet work (excluding the
supporting frame work) fitted and fixed with 10 mm. dia J
or L hook-bolts, limpet and bitumen washers and putty
complete with 150 mm. end lap and one corrugation
minimum side lap. (Payment to be made on area of finished
work)(GCI sheet to be supplied by contractor)
32.2
786
25309.2
... More
Galvanised iron sheet ridging fitted with necessary bolts, screws, washers etc complete.(225mm end lapping)
300 mm lapping each way
With 0.80 mm sheet
7
478
3351.6
... More
Galvanised iron sheet eaves gutter fitted with necessary bolts, screws, washers etc complete.(225mm end lapping)
300 mm lapping each way
With 225 mm Wide
7
349
2443
... More
Supplying, fitting & fixing 1st quality Ceramic tiles in walls
With Sand Cement Mortar(1:3)15 mm thick and 2mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq m and joint filling using white cement slurry @ 0.20kg /Sqm stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed withcolouringoxide if required to match the colour of tiles includingroughening of concrete surface, if necessary or by syntheticadhesive & grout materials etc.
33.66
1103
37128.33
... More
Supplying and laying chequered tiles of any shade & of
approved quality with (1:1½:3) cement concrete laid in
panels or patterns as directed in pavement, footpath etc.
including necessary underlay 25 mm thick [avg] cement
mortar (1:3) complete in all respect with all labour and
materials. [Using cement slurry @ 4.4 kg/Sq.m at back side
and @2.4 kg/Sq.m for joint filling]
(1) 25 mm thick
7.56
1022
7729.34
... More
Cost of PIB
1
2000
2000
... More
Add @ 18% GST
1
45585
45585
... More
Labour cess @1%
1
2987
2987.35