Gorkhaland Territorial Administration Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Gorkhaland Territorial Administration - GTA Tender
Civil And Construction
Building Construction
Eprocure
Opening Date28 Aug 2024
Closing Date10 Sep 2024
Tender Amount₹ 18,23,713
Costs
EMD
₹ 36,474Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GTA_740067_1Bid Award Id
ViewTender No
GTA/P.S./ZSB /EE/ DED(ES-I)/ NIeT-28(1st Call)/e-Tender/2024-25Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Stone Boulder 150 mm N. Bengal variety
16.71
30398
1819.16
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation
10.13
936
92.41
Cement concrete with graded stone ballast (40mm size) excluding shuttering in ground floor or foundation (B)with N.B.variety (a) 1:3:6) Proportion
6.92
49245
7116.47
Ordinary cement concrete (mix 1:1.5:3) with graded
stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.(ii) River bazree.Ground Floor
47.21
407267
8626.72
First Floor
10.49
91681
8739.94
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
315.9
125747
398.06
First Floor
119.22
50013
419.51
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars stirrups, binders etc. initial straightening and removal of loose rust (if necessary) cutting to requisite length hooking and bending to correct shape placing to proper position and binding with16G black annealed wire at every intersection complete as per design and directions.For works in foundation, basement and upto roof of ground floor/upto 4m. i) Tor Steel/Mild Steel taking given below (%) of the Cement Concrete (1:3:6) Ground Floor
5.56
528843
95132.81
First Floor
1.24
118216
95644.57
PARKING SPACE : Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works)(iii) In mixed hard soil (i,e hard moorum and soil containing laterite and boulders which do not require blasting)
96
12573
130.97
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1500 mm
23.44
3331
142.14
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
119.44
23628
197.83
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.`-- Do -- -- Do - without rolling but including ramming.
39.06
2979
76.27
Cement concrete with graded stone ballast (40mm size) excluding shuttering in ground floor or foundation (B)with N.B.variety (a) 1:3:6) Proportion
5.53
39354
7116.47
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
54.72
21781
398.06
Plum concrete work with cement concrete (1:3:6) with 30 mm down graded stone metal and 60 % and stone boulder of size 150 mm and above 40% placed in position as directed excluding shuttering if any, including cost and carriage of materials to work site and other necessary charges all complete.
60.11
284034
4725.24
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar. (a) 20 mm thick plaster
43.2
8587
198.79
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
43.2
2100
48.62
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements