Gorkhaland Territorial Administration Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Gorkhaland Territorial Administration - GTA Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date26 Dec 2024
Closing Date2 Jan 2025
Tender Amount₹ 2,48,963
Costs
EMD
₹ 4,979Document Cost
₹ 1,244Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GTA_790615_1Tender No
02/SDGP/15CFC/2024-25Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Hire and labour charges for shuttering with centering and necessary staging(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of
Engineer-In-Charge. Sq
upto 4 m using approved stout props and thick hard wood planks of approved
thickness with required bracing for concrete slabs, beams and columns,
lintels curved or straight including fitting, fixing and striking out after
completion of works (upto roof of ground floor
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of
34.59
400
13863.67
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree
2.84
6370
18116.64
... More
Cement concrete with graded stone ballast (40 mm size excluding shuttering) With N.B. Variety stone metal.(1:3:6)
0.81
5971
4854.42
... More
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface]. a) with 1:6 cement mortar b) 20mm thick plaster
38.32
232
8896.74
... More
Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with
holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting willbe made seperately) a) 25mm dia medium quality
30
366
10980
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL @ 0.8% (155.596x0.8%x7.85)
0.22
75332
16799.13
... More
Labour for fitting and fixing high density poly-ethylene pipes or P.V.C. pipes for above ground work including costs of jointing materials, paints etc.fitting and fixing all necessary specials, cutting pipes, making threads, cutting holes in walls of R.C. floor where necessary and mending goods all damages excluding the cost of masonry or concrete work, if necessary ,but including the cost and fitting and fixing holder bat clamps(any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineer-in-charge.(Payment will be made on center line measurment of the total pipeline including specials.) .Above Ground 25 mm dia
1560
33
52416
... More
Supply of High Density Poly-ethylene Pipe conforming to IS-4984-1985 (Dia)[PE-63].10 Kg/Sq/Cm.(Dia) Working Presssure).25 mm dia. medium quality HDPE
1560
52
82368
... More
GST 18% on sub total
1
37591
37591.58
... More
Labour welfare cess @1%
1
2464
2464.34
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements