Gorkhaland Territorial Administration Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Gorkhaland Territorial Administration Tender
Eprocure
Opening Date30 Jul 2018
Closing Date13 Aug 2018
Tender Amount₹ 15,91,755
Costs
EMD
₹ 31,835Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_GTA_183852_1Bid Award Id
ViewTender No
EE/PandRDD/KPG/eNIT-06/2018-19Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
CONSTRUCTION OF 10 MTR SPAN RCC FOOTBRIDGE OVER GOKULEY KHOLA BONG G.P 35 NO BONG DURPIN CONSTITUENCY
CONSTRUCTION OF 10 MTR SPAN RCC FOOTBRIDGE OVER GOKULEY KHOLA BONG G.P 35 NO BONG DURPIN CONSTITUENCY
BOQ Items
Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site
161.55
789241
4885.43
Back filling behind abutment, wing wall and returnw all complete as per drawing and Technical specification.
Granular Material
33.14
85893
2591.83
Furnishing and Placing Reinforced / Pre-stressed Cement concrete in Super-structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement and admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications. RCC Grade M20 (1:1.5:3)
Using Concrete Mixer
17
122732
7219.53
Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.
2
116158
58079.05
Providing Form Work of soffits of slabs/beam(above 3 meters clear span) of culvert and bridges(major and minor) and box culverts including hire and labour charges for the same stripping off and removing after completion of works as per specification but excluding staging: Clear span upto 15.00 m
49.03
19633
400.44
Providing Form Work and staging including hire and labour charges for the same as required for foundation concrete work of depth not exceeding 500mm and for concrete works in vertical faces of parapet,curb,road curb, cable tray,cable traycover so as to give a good concrete finish including stripping off and removing after completion of work as per specification
88.83
21503
242.08
Providing weep holes (150mmX75mm) in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
50
6561
131.22
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary With 1:4 cement mortar
25.2
4817
191.17
Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint. Two Coats
18
2016
112
Carriage of materials from Siliguri to Worksite
-
-
-
Cement
27
22677
839.92
Steel
2
1778
889.12
Carriage of materials by Head load
-
-
-
Cement
27
110916
4108
Steel
2
15168
7584