Gorkhaland Territorial Administration Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Gorkhaland Territorial Administration - GTA Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date25 Feb 2022
Closing Date18 Mar 2022
Tender Amount₹ 94,99,572 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Hire and labour charge for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams,columns, lintels curved or staight including fitting fixing and striking out after complection of works. (upto roof of ground floor).(b) Where staging is not reqiured.

620.61

-

242.08

... More
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.

380

-

158.82

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. A) Granular material

118.59

-

3372.86

... More
Earth in filling in foundation trenches and at the back of abutments with good earth (sandy soil) in layers not exceeding 15 cm. including watering and ramming layer by layer complete with earth obtained by fresh excavation from land arranged by Department beyond 150 m. but within 300 m. including all lifts. Earth to be approved by the Engineer-in-charge.

365.08

-

182.12

... More
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1.500 mm.

459.78

-

134.91

... More
b)Depth of excavation for additional depth beyond 1500 mm and upto 3000 mm but not requiring shoring

459.78

-

217.62

... More
c) Add extra for cutting laterite/sand stone (i) cutting with chiesal

114.95

-

197.68

... More
Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work).(a) With earth obtained from excavation of foundation.

321.85

-

87.71

... More
(B) Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same thorough saturation with water ramming complete including the cost of supply of sand. (Payment to be made on measurement of finished quantity. At all floors and all levels

42.34

-

1630.18

... More
Pre-Constructional Anti-termite measures:((c) Anti termite treatment to the top surface of the consolidated earth within plinth walls with chemical emulsion by admixing

423.36

-

124.43

... More
Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete (b) M 25 Grade. (ii ) N.B. Variety (Stone Metal)

259.5

-

9261.81

... More
(II) Cement concrete with 30 mm. down graded shingles excluding shuttering.N.B. VarietyIn ground floor . (a) 1:3:6 proportion.

65.79

-

6255.08

... More
Hire and labour charge for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams,columns, lintels curved or staight including fitting fixing and striking out after complection of works. (upto roof of ground floor).(a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. .

1059.51

-

377.82

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.(a) For works in foundation, basement and upto roof of ground floor/upto 4m.(i) Tor steel/Mild steel.II. Other than SAIL/TATA/RINL

32.59

-

90295.55



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.