Gorkhaland Territorial Administration Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Gorkhaland Territorial Administration - GTA Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date21 Jun 2024
Closing Date27 Jun 2024
Tender Amount₹ 7,14,214
Costs
EMD
₹ 14,284Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GTA_691616_3Bid Award Id
ViewTender No
PR/GBN-I_GP/e-NIT/01/2024-25Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
(II) Cement concrete with 30 mm. down graded shingles excluding shuttering.N.B. VarietyIn ground floor .
1.63
10487
6434.17
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
54.27
25923
477.67
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
0.42
35035
83418.61
Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site
5.01
26462
5282
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
54.27
15689
289.1
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
54.27
2638
48.62
Supplying, fitting and fixing G.I. pipes of TATA make with all necessary
accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple,
longscrew, reducing socket, reducing tee, short piece etc. fitted with
holder bats clamps, including cutting pipes, making threads, fitting, fixing
etc. complete in all respect including cost of all necessary fittings as
required,jointing materials and two coats of painting with approved paint
in any position above ground. (Payment will be made on the centre line
measurements of total pipe line including all specials. No separate
payment will be made for accesories, (i) (i) 100 mm dia. medium quality
459
559493
1218.94
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements