Gangasagar Bakkhali Development Authority Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Gangasagar Bakkhali Development Authority - GBDA Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date20 Jan 2024
Closing Date5 Feb 2024
Tender Amount₹ 44,09,907.51 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(b) For additional depth beyond 1.5 m. and upto 3.00 m

220

523

115104.04

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation

243.73

92

22523.53

... More
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)

224.43

1115

250413.4

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

1057.5

430

454978.59

... More
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion

160.12

5518

883603.57

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out aftercompletion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge

847.3

399

338287.07

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety

159.2

7921

1261166.53

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing (i) Tor steel/Mild Steel and direction (a) For works in foundation and upto roof of ground floor/upto 4 m I. SAIL/ TATA/RINL

18.75

71030

1331540.26

... More
Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation, ground floor

434.84

6690

2909487.42

... More
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement (ii) 25 mm. thick

720

320

230827.82

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary (Ground floor). [Excludingcost of chipping over concrete surface] (ii) With 1:4 cement mortar (a) 20 mm thick plaster

1468.8

225

331017.54

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE: Cement 0.152 cu.m per 100 sq.m.

1660.8

39

64839.15

... More
Supplying, fitting and fixing in position C.I. manhole/ pit cover with rim. (a) Round (iii) 450 mm X 100 mm X 50 kg (approx.)

16

4202

67236.59

... More
Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge

974.92

197

192876.21

... More
Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared)

1080

13

14158.58

... More
Eucalyptus bullah walling with earth filled bags 1.30m (av.) high of 10cm. dia and 4m long bullah pin @ 0.375 mtr. c/c bullah walling of 2.7m (av) below G.L. including fitting, fixing 3 nos. of 10 cm dia bullah as runner providing 2.50 mtr. long 10.0 cm dia bullah as tie bar @ 2.25 mtr c/c and 10.0 cm dia. and 3.0 mtr. long bullah as tie post @ 2.25 mtr. c/c driven @ 2.5 m below G.L. and walling with filling empty cement bags with earth and placing them in position including tying or sewing mouth including cost of thread including cost of all materials and two coat of coal tarring to all Eucalyptus bullah etc. complete including the cost of materials as per direction.

105

3814

400556.28

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD. (E) 900 mm dia

30

5220

156609.67



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.