Eastern Railway Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Eastern Railway - ER Tender

Goods
Railway
Transportation and Logistics
Ireps
Opening Date26 May 2020
Closing Date26 Jun 2020
Tender Amount₹ 1,47,39,884 
Notes
Download

Costs

Summary

P.way Maintenance Work Under Sse(p.way)/east/bwn

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Trolleying of switch, Xing, rails, any type of sleepers and other P.Way materials upto 1 km. with free lead up to 100m, all lift , with proper stacking including crossing of multiple lines with contractors own tools & plants as directed by Engineer in charge or his representative. Trollying Ordy. PSC Sleepers.

2500

72

181375

... More
Lifting of track upto 150mm in two stages including point and xing as required to achieve correct longitudinal level with initial packing as directed by Engineer in charge or his representative. (Lifting of track at P&C will be paid 1.5 times the straight length of track).

2500

51

128975

... More
Through Packing of PSC Sleepers as per IRPWM in sequence as directed by Enginner -in-charge 6 or his reprentative in running track with all Contractor's labour , tools& plants. Each such packing should include gauging ,aligning, squaring and respacking as per direction given by Engineer-in-charge or his representative. The rate include ballasting by using available ballast at site with a free lead of 50 mtr.track etc. Here unit "Each" implies for each sleeper.

25000

35

895500

... More
Overhauling of LC Gate to provide clean cushion upto 300mm by digging below the sleeper & 8 removing ballasted muck/earth for a total width upto 4.8m. Ballast should be screened and put back to track with afree lead of 100 mtr. Rate includes packing of track to maintain proper long level and to make the LC gate Track fit for normal traffic.

280

844

236468.4

... More
Shallow screening of track including lifting of track from 0 to 100 mm with one round of through packing and macking up of entire available cess as per procedure given in para 227 of IRPWM. (Shallow sreening of P&C will be paid 1.5 times the straight length of track).etc.

2500

118

297075

... More
Changing/Interchanging of rails 60kg/52kg/90R for insertion of rails/glued joints,SEJ,Elimination of rail with worn out gauge face etc. with initial packing & with proper gauge & alignment(one mtr. means one line meter of rail length,one track mt.= 2 rail meter).

3000

30

91050

... More
Laying of SEJ on ends of LWR/CWR which includes cutting rails, drillings holes on rails including 11 greasing of fish plated glued joint as per direction of site in charge.(Oil & Grease to be supplied by the contractor). The rate includes insertion of SEJ sleepers and SEJ rails with all fittings, all labour tools and plants etc. as directed by Engineer in charge or his representative.

10

3023

30233.2

... More
Changing of worn out switches ( 1 in 12 or 1 in 8.5) under traffic block including trolleying up to 12 1Km fromPWI store and keeping the released material as per direction of engineer or his repraentative. The rate includes removal of older switches with changing of fitting in complete in all respect .(50% payment will be made if tongue or stock rail only is to be changed).Here unit "Set" implies for per set.

20

1726

34536.8

... More
Changing of worn out crossing ( 1 in 12 or 1 in 805) of any type under traffic block including trolleing up to 1 Km from PWI store and keeping the released material as per direction of engineer or his repraentative.

20

2015

40319.4

... More
Casual renewal of any type of damaged special type points & xing Sleeper maintaining gauge ,XL including packing as per requirement for making track fit for normal speed as per instruction of Engineer in charge or his representative.

350

199

69986

... More
Changing insertion/laying/replacement of 90R/52kg/60Kg rail/Glued joints in track where ever requied. Rate includes opening and refixing of all fittings recoupment/ replacement of missing/ damaged fittings. 15 gauging , fixing of fish plates as per requirment, inital packing to make fit the track movement and stacking the realesed rail/glude joint within 100M as per diewction of engineer in- Charfe. missing/damaded fittings. Gauging, fixing of fish paltes as per requirment, initial packing to make fit the track movement and staking the realsed rail/gluld joint within 100

325

90

29448.25

... More
Changing of SEJ rail including fittings over PSC/Wooden layout. The rate includes cutting,drilling & trollying SEJ rail upto one Km and return of released rail to nearest PWI store and oiling & greasing of SEJ and all its fittings.

10

1373

13732.3

... More
Destressing of rails 52/60kg with hydraulic rail tensor or manually as per LWR manual including 17 cutting of rails opening of fittings and placing the rails on thr roller, unloading the same and re fixing all types of fittings as per direction of engineer in charge or his representative during day/ night traffic block . Roller as per fig. 5.3 (VIII) (a) as per LWR manual to be supplied by the contactor and hydraulic to be supplied by rail way. The rate includes removal of seized pandrol clip/insert/liner etc as per direction of site in charge.

6000

12

77520

... More
Painting of SKV and F.B. weld collars of rail by removing dust , loose dust and mill scale by wire 18 brushing, to scrap welded area with water to make it freefrom slag and other water soluble compounds. After drying painting to be done by one coat of bituminous black , confirming to IS-9862.A second coat with the same paint should also be applied after eight hours and within seven days of first coal painting. Painting should be carried out by brush only.

7000

8

62930

... More
"Painting of rails by anti-corrosive paints conforming to IS-9862 as per standard specification.Painting of rails shall be done after scrapping of rails with wire brush & cleaning dust/scale/grease etc 19 from the rail.The rate includes two coats of black bituminous anit corrosive paints conforming to IS - 9862.Second coat with the same paint should be applied after eight hours & within senven day of first coat painting.The rates are inclusive of cost of all paints,tools & plants,labour,euipments,other consumables including all lead,lift,crossing of track,opening of ERC,Liners & refixing the same ERC,Liners etc.The work has to be done following due process of safety of track as per IRPWM and as per direction of engineer-in-charge. "

24000

69

1657440

... More
Drilling hole 6 mm. dia for signal bonding including supplying of channel pins and bonding wires.

400

48

19548

... More
Hiring charges for 5-KVA DG Set including fuel lubrication oil operation and maintenance with 21 lighting arrangement by 06 Nos. 500 Watt. Halogen fittings,complete and 4 Nos. F.L. fittings complete at any location as per direction by Engineer in charge or his representative. Here unit "Hour" implies for per M/C per Hour.

600

488

292848

... More
Drilling holes 18mm dia. In rails for traction OHE and 'X' Bonds.

120

41

4936.8

... More
Making & Erection of creep post including cutting and painting of rails as per direction of Engineer in charge or his repesentative. Rail will be supplied by Railway . The rate include cutting of rail , transportation / trollying upto site within 1 Km excavation of earth , and filling, cost of paint , all labour tool & Plants etc.

12

787

9446.28

... More
Assisting CSM/Duomat during day/night pre-block work to ensure smooth tamping as dircted by 24 Engineer in charge or his representativ. The rate includes taking pre-block measurements, opening of ballast, squaring of sleeper, opening of joggle fish plates, recoupment of missing fitting provided by Railway, removing wooden blokes etc. as per direction of site incharge.

50000

7

370000

... More
Assisting UNIMAT/MPT machine during day/night for the pre-block work to ensure smooth tamping 25 as dircted by Engineer in charge or his representative. The rate includes taking pre-block measurements, opening of ballast, squaring of sleeper, opening of joggle fish plates, recoupment of missing fitting provided by Railway, removing wooden blokes etc. as per direction of site incharge.

50

1459

72999.5

... More
Post block work of CSM/Duomatic during day/night by filling up the ballast in tamoing gone, 26 recoupment of fittings and squaring of sleeper if required. The rate includes taking post- block measurements, refixing of joggled fish-plates, refixing wooden blocks & packing the portion of track (not more than 10 mtr. at each location) not tamped by CSM/Duomatic etc. as per direction of site incharge.

50000

2

123500

... More
Post block work of Unimat/MPT during day/night machine by filling up the ballast in tamping zone, 27 recoupment of fittings and squaring of sleeper if required. The rate includes taking post block measurement as per direction of site incharge , refixing of joggled fish-plates, refixing of wooden blocks & packing the portion of turn out not tamped by UNIMAT etc.

50

601

30088

... More
Greasing of leg of ERC & eye of MCI inserts as directed by Engineer in-charge or his 28 representative (with contractor's own grease graphite-'O' as per IS specification). The rate includes removal of ERC, greasing it & refixing including all labours tolls & plants as per directonof Engineer in charge or his representative. Here unit "Each" implies for Each ERC

100000

8

886000

... More
Fabrication and fixing check rails 52/60kg for LC gate as per RDSO Drawing with contractor's own 29 tools and plants including cutting, grinding, machining etc. with all lead, lift to and from store to site, stacking of released material, crossing of multiple tracks etc. within 100 mtr. Rails for making check rail will be supplied by Railway.

150

1037

155637

... More
Dressing & boxing of track with available ballast with picking and leading the excess ballast to 30 deficient location within 30 m. lead and making standard ballast profile as per LWR manual. The rate includes picking up ballast from cess and slopes, cleaning/uprooting plants & jungle from the entire available cess etc. s per direction of Engineer in charge or his representative.

25000

22

558500

... More
Cleaning of yard drain and clearing the ballast and muck out of drain. The rate includes disposal of 31 released muck outside the yard within 500m with all lead and contractors labour, tools & plants as per direction of Engineer in charge or his representative.

160

297

47646.4

... More
Opening of Corroed/seized/broken plate screws which can not be opened at fan shape points to be changed by new one with grease graphite. The rate includes the existing plate screw to be cleaned and dust free by applying gas , half cut plate screw to be welded by Arc welding with the existing broken screw to facilitate the 32 same to be opened out by box spanner. The rate also includes supplying of all equipments such as Generator, Arc welding set, tools and plants including fuel such as Gas, Diesel, Mobile oil, electrodes all as per requirement of machine by contractor at his own cost. Transportation of the equipments from one site to another to be done by contractor at his own cost. Railway will supply the scrap/new plate screw including grease graphite.The rate also includes all fitting,fixing at site as per direction of Engineer in charge or his representative. Here unit "Each" implies for E/Plate (having 4 plate screw)

450

95

42786

... More
Changing of LC gates sleepers after opening of road surface of any type and filling the same after work.The rate including oiling & greasing of fittings(supplied by Railway) and adjustment of check rail as per dirction of Engineer in charge or his representative.

200

515

103052

... More
Removing of rusted ERC by heating,applying gas or approved chemicals without damaging insert and replacing the old ERC by new one supplied by railway(heating arrangement,gas & chemical will be provided by the contractor).The work to be done as per direction of Engineer in charge or his representative.

2500

42

105725

... More
Fabrication & fixing of approach guard rail of standard length as per IRPWM/IRBM including cutting, bending as required to suite approach PSC layout after dismantling of existing one as per direction of site- in-charge etc.

6

2164

12989.82

... More
Unloading of stone ballast from BOB/BOBY Hopper wagon on the track during the traffic block on 36 running line,with all tools & plants consumable if any supplied by Rly. It will be inclusive of cleaning the infringement where ever required for safe passage of train after the block.Dressing of unloading ballast including filling of sleeper interspace upto top of sleeper & boxing from outside@ 40<37@ payment will be done if dressing/boxing not completed).

3000

43

130830

... More
Extra for Unloading during night time.All lighting arrangement required during night work to be arranged by contractor.

3000

2

6480

... More
Assisting UTV Machine during day/ night, loading & unloading Rail/ Sleepers etc. including keeping materials ready before Block period.

300

130

39153

... More
Transporting of all sorts of P.Way materials required in use of truck including all 39 loading,unloading,all lead,lift,ascent,descent and crossing multiple lines for loading with stacking the same with in free lead of 150 mtrs. after unloading complete in all respect as per instruction of engineer in charge at site. With lead upto 40 kms.

2500

15

38375

... More
Transporting of all sorts of P.Way materials required in use of truck including all 40 loading,unloading,all lead,lift,ascent,descent and crossing multiple lines for loading with stacking the same with in free lead of 150 mtrs. after unloading complete in all respect as per instruction of engineer in charge at site. with lead above 40 kms. upto 120 kms.

20000

12

243000

... More
Transporting of all sorts of P.Way materials required in use of truck including all 41 loading,unloading,all lead,lift,ascent,descent and crossing multiple lines for loading with stacking the same with in free lead of 150 mtrs. after unloading complete in all respect as per instruction of engineer in charge at site. with lead above 120 kms.

10000

5

59600

... More
Supply of round up chemical for deweeding,shalimar brand or similar. Here unit "Litre" implies for Per litre.

200

723

144744

... More
"Supplying,fitting,fixing of retro reflective board as per ASTMD 4956 standard hight intensity retro 43 reflective sitting on 2 mm thick aluminium alloy sheet confirming to IS:737 as backing materials making engineering indicator as per IRPWM and station name signage item includes cost of transportation lead,lift etc. complete in all respect. "

100

6667

666741

... More
Assisting to thermit welding of 60/52 Kg. rail joints and glued joints including supply of petrol and labour by SKV process under traffic block on running and filling/grinding of welded joints on top and both face.The 44 rate also include provision of required gap by shifting the rails longitudinal,jimcrowing the rail, adjustment of sleeper at joints,supporting of welded joints on wooden blocks for a minimum period of 3 days after welding,carrying of welding,carrying of welding materials and other accessories to the site of work from PWI's store and back to PWI's store by head head/trolley or by any means.The rate also include respacing of disturbed sleeper at welded joints as instructed by PWI including initial packing and also depositing released fittings at PWI's store,Trimming and grinding will be done by machine and equipments as per special condition No. 19 should be supplied by contractor free of cost etc. Upto Two Joint per day

50

4506

225332

... More
Assisting to thermit welding of 60/52 Kg. rail joints and glued joints including supply of petrol and labour by SKV process under traffic block on running and filling/grinding of welded joints on top and both face.The rate also include provision of required gap by shifting the rails longitudinal,jimcrowing the rail, adjustment of 45 sleeper at joints,supporting of welded joints on wooden blocks for a minimum period of 3 days after welding,carrying of welding,carrying of welding materials and other accessories to the site of work from PWI's store and back to PWI's store by head head/trolley or by any means.The rate also include respacing of disturbed sleeper at welded joints as instructed by PWI including initial packing and also depositing released fittings at PWI's store,Trimming and grinding will be done by machine and equipments as per special condition No. 19 should be supplied by contractor free of cost etc. Three Joint per day

120

3351

402132

... More
Assisting to thermit welding of 60/52 Kg. rail joints and glued joints including supply of petrol and labour by SKV process under traffic block on running and filling/grinding of welded joints on top and both face.The rate also include provision of required gap by shifting the rails longitudinal,jimcrowing the rail, adjustment of 46 sleeper at joints,supporting of welded joints on wooden blocks for a minimum period of 3 days after welding,carrying of welding,carrying of welding materials and other accessories to the site of work from PWI's store and back to PWI's store by head head/trolley or by any means.The rate also include respacing of disturbed sleeper at welded joints as instructed by PWI including initial packing and also depositing released fittings at PWI's store,Trimming and grinding will be done by machine and equipments as per special condition No. 19 should be supplied by contractor free of cost etc. More than Three Joint per day

250

2661

665430

... More
Casual renewal of ordinary PRC Sleeper.

2500

280

701400

... More
Manual Deep screening of ballast upto depth of 300mm below the bottom of sleeper and upto centre line of two track/entire available cess/coping wall in PF area/ballast retaining wall on bridge as per procedure laid down in para-218 of IRPWM 2004 & LWR manual. The rate includes the followings.

1000

356

356170

... More
Manual Deep screening of 52/60Kg Fanshaped Pts & Xings 1 in 12 in running track 250mm below 49 bottom of replaceed PSC Sleeper for distance of 1.5 M from the edge of PSC Sleepers. The work should be done as per details in spl. Condition if formation is reached within 25mm cushion to be provided by lifting the track.( In 1 in 8.5 points & crossings -70% payment will be made)

6

18991

113950.68

... More
1st to 4th round consolidation Packing in 1 in 12 ut as per para 224 of IRPWM (70% payment will be made if the work is done on 1 in 8.5 Pts. & Xings) . Here unit "Set" implies for "Per Set per pkg. "

24

4662

111888.48

... More
Redistribution of Ballast for making ballast profile as per IRPWM.The work includes cutting of excess ballast and spreading the same with proper screening with a maxm. Lead of 30 mtrs. On either side.

5000

30

154100

... More
Provision of two semi skilled labour for assisting blacksmith as perinstruction of PWI/Incharge from 7/00 Hrs to 17/00 Hrs.Here unit "Each" implies for Each Day.

500

899

449770

... More
Provision of two unskilled labour for push trolley as per instruction of PWI/Incharge from 7/00 Hrs to 17/00 Hrs. Here unit "Each" implies for Each Day.

200

815

163032

... More
Supplying,manufacturing & fixing of new leading stretcher bar(Drg.No.T-4885/4886) /(Drg.No.T- 3649/3650)at new location including holes and taken out the existing stretcher ar from any turn out.Rate also includes the deposit the relased material to the PWI store including leading,crossing, multiple track etc, if required.

20

5104

102085.2

... More
Supplying,manufacturing & fixing of new leading stretcher bar(Drg.No.T-3649/3650)/(Drg.No.T- 4885/4886) at new location including holes and taken out the existing stretcher ar from any turn out.Rate also includes the deposit the relased material to the PWI store including leading,crossing, multiple track etc, if required.

48

5104

245004.48

... More
In situ reconditioning of elongated inserts to ensure proper fixing of pandrol clip. Here unit "Each" implies for Each insert.

800

286

228968

... More
Supplying & fixing J Hook Bolts & Nuts complete 22/28 mm. x 325 mm. with square washer S.Coil Spring Washer,double nut etc, complete.

100

371

37145

... More
Supplying & fixing of Guard Rail Bolt & Nuts with Tappered Washer etc. complete.

400

158

63320

... More
Supplying & fixing of Split Pin with the Bolts of Channel Sleeper Fitting etc. complete. Here unit "Set" implies for per set.

1000

6

6470

... More
Supplying & fixing GR pad between Running Rail & Steel Channel Sleeper of(145 x 258 x 10)mm. thick for 60 kg. Rail.

200

389

77934

... More
Supplying & fixing E.pad(F-20)(270 x 25 mm) th.As per RDSO drawing & specification.

20

2194

43885.4

... More
Insulated/Non insulated as per requirement rail clip for 60 kg. rail(82 x65 x 53 mm) as per RDSO approved drawing(outer).

100

236

23687

... More
Insulated/Non insulated as per requirement rail clip for 60 kg. rail(82 x65 x 53 mm) as per RDSO approved drawing(inner).

100

236

23687

... More
Removing existing MCI insert from the PSC sleeper by ercussion machine with out damaging the 65 PSC sleeper cleaning the dismantled portion, making it dry blowing dry air by blower re-fixing the MCI inserts so removed by Epoxy ( Ardor or equivalent ) mix as per the manufacturers specification. Work to be done as per direction of Engineer-in -charge. The rate to include cost of material, labor ,lead, lift, crossing of line etc (If new MCI insert is required, then it will be supplied by Railway free of cost.)

50

636

31834

... More
Drilling hole of 38 mm diameter up to required depth electric drill machine suitable to hold MCI 66 insert without damaging the PSC sleeper cleaning the drilled hole making it dry with EPOXY (Aradur or equivalent) as per manufacturers specification. Grinding/cutting off existing MCI insert if required to facilitate fixing of rail line. The rate to include cost of material, labor, lead, lift crossing of line etc. MCI insert to be provided by Railway free of cost.

50

350

17523

... More
Drilling suitable holes in sleepers to fix ferrules (ferruls to be supplied by the contractor) with 67 'SHRINKKOMP 30' (ACC Products). Rate includes cost of labour, materials, tools & plants, lead, lift ascend ,descend ,crossing of track etc to complete the work in all respect. Grouting to be done as per specification of manufacturer

60

187

11279.4

... More
Changing of worn out ferrules including supply of ferrules and drilling in PRC Sleeper etc. Here Unit " Each" implies for Each/ Ferrule.

50

215

10789.5

... More
Cleaning jungle including removal of cut or uprooted materials with lead upto 100 m heavy grass shrub...etc.

30000

127

63376.66

... More
Drilling holes in rails below 90R/52kg rails 90 UTS section for fish bolts outside track 60kg/65kg section for F/Bolts outside track 3 200.00 Each 10.50 2100.00 393.13 10355.73

600

8

23670.24

... More
Drilling holes in rails below 90R/52kg rails 90UTS section for fish bolts running track.

200

10

10355.73

... More
Drilling holes in rails below 90R/52kg rails 90UTS section for fish bolts running track. 60kg/65 kg section for F/Bolts in running track 5 100.00 Each 8.00 800.00 393.13 3945.04

1000

12

59175.6

... More
Distribution of small track fitting by Rly's materials trolley upto a distance of 2 kms.

100

145

71503.85

... More
Distribution of small track fitting by Rly's materials trolley upto a distance of 2 kms. for every additional km.(4 lead) 15 2000.00 Metre 0.50 1000.00 393.13 4931.30

50

39

9616.04

... More
Stacking of rails from 60kg/52kg

2000

-

4931.3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.