Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Eastern Railway

Howrah, West Bengal

  • Opening Date

    05 Aug 2019

  • Closing Date

    02 Sep 2019

  • Tender Amount

    ₹ 67,12,141

  • EMD

    ₹ 1,34,300

Are you Looking for Joint Venture Partners, Contractor Consortium, Back-to-Back Contractor, Project Financier?
We will help you to find the right match for FREE.
Summary

Replacement Of Girders Of Bandel Sub Way

Don't have sufficient eligibility, BG funds or resources?
We will help you to find the right match for FREE.
BOQ Items

No BOQs Available

DRM/ER acting for and on behalf of The President of India invites E-Tenders against Tender No 129_2019-20 Closing Date/Time 02/09/2019 14:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored. Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are not allowed. 1. NIT HEADER Name of Work Replacement of girders of Bandel Sub way Bidding type Normal Tender Tender Type Open Bidding System Single Packet System Tender Closing Date Time 02/09/2019 14:00 Date Time Of Uploading Tender 05/08/2019 17:24 Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Advertised Value 6712141.91 Tendering Section OA/3 Bidding Style Single Rate for Tender Bidding Unit Above/Below/Par Earnest Money (Rs.) 134300.00 Validity of Offer ( Days) 21 Tender Doc. Cost (Rs.) 5000.00 Period of Completion 8 Months Contract Type Works Contract Category Expenditure Bidding Start Date 19/08/2019 Are Joint Venture (JV) firms allowed to bid No Ranking Order For Bids Lowest to Highest Expenditure Type Revenue 2. SCHEDULE S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule A-Non-schedule item 6040770.00 01 01 42.00 MT 97142.00 4079964.00 AT Par 4079964.00 Item Description:- Supply and fabrication of Rivetted/welded steel girders as per approved drawing with all up- to-date alterations. The rate is inclusive of all costs of materials, fabrication like rivetting, welding, cutting, drilling, grinding etc., cost of all labour, materials, tools and tackles, heavy machineries, testing equipments, structural steel section as per approved drawing and all other consumables like welding wire, rivets & bolts with nuts & washers etc. All materials like structural steel, welding consumables, bolts, nuts etc., required for fabrication of girders, will be tested as per provision made in IS/IRS code or as and when directed by Engineer-in-charge, cost of which is included in this item. All fabrication works to be carried out as per IRS B1-2001 with all up-to-date correction slips and to be done at any well equiped workshop. The rate shall include the cost of painting with a thick wet coat of Zinc chroamte primer conforming to IS-104 at all the hidden portion prior to assembling of members. The rate includes trial assembling and dismantling of the same after necessary checking at workshop. The rate shall also include the cost of loading of the girders at work shop , transporting by Contractor's own arrangement to the bridge worksite, unloading the same, stacking them without any infringement to the running track with all lead, lift, crossing line, stacking etc. as decided by the Engineer-in-charge and assembling of girders at site including rivetting complete in all respects. 02 02 494.00 Sqm 718.00 354692.00 AT Par 354692.00 Item Description:- Metallising of girder as per relevant IS Code. The rate includes sand blasting, metalising with aluminium wire, applying Ist priming coat with IS 5666 & 2nd priming coat with IS 104 and two final coat with IS 2339.First final coat will be applied at workshop and 2nd final coat has to be applied after launching of girder after necessary touchup of primer coat, if damaged during transhipment. The work shall be carried out as per B-1- 2001 and IRBM with all uptodate correction slips. The cost of testing of all materials like aluminium wire, paints (each batch of paint) etc. will be borne by the contractor. 03 03 35.00 Metre 11620.00 406700.00 AT Par 406700.00 Item Description:- Dismantling of existing girders under traffic block by contractor's own means as per approved scheme taken all safety precaution. The rate includ

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.