Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Eastern Coalfields Limited - ECL Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date18 Dec 2024
Closing Date4 Jan 2025
Tender Amount₹ 1,20,15,384 
Notes
Download

Costs

Summary

Filling Of Abandoned Pit (33 Nos,) And Sealing Of 05 Nos Pit And Demolishing Of Structure At Jamuria Belt Sripur Under Satgram- Sripur Area

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars

724

98

71603.6

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)

10.6

7649

81082.58

... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. In cement mortar

10.6

1576

16711.43

... More
E/W in Filling over areas (exceeding 30cm in depth. 1.5m in width 10sqm on plan) - All kinds of soil with pay loader

45462.27

69

3158263.9

... More
Cost of Loading of OB at North Seasol Departmental OCP OB Dump per CUM

45462.27

19

889696.62

... More
Cost of Transportaion of OB per CUM fromNorth Seasol Departmental OCP OB Dump to zone -A and unloading lead (8-9) km

19573.27

112

2208061.04

... More
Cost of Transportaion of OB per CUM fromNorth Seasol Departmental OCP OB Dump to Zone-B and unloading lead (9-10) km

5667.19

124

704884.59

... More
Cost of Transportaion of OB per CUM fromNorth Seasol Departmental OCP OB Dump to Zone-C and unloading lead(8-9) km

3575

112

403295.52

... More
Cost of Transportaion of OB per CUM fromNorth Seasol Departmental OCP OB Dump to Zone D and unloading lead (10-11) km

8860.31

136

1205887.65

... More
Cost of Transportaion of OB per CUM fromNorth Seasol Departmental OCP OB Dump to Zone E and unloading lead (7-8) km

7786.51

102

798194.73

... More
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift upto1.5 m. All kinds of soil.

48.6

26

1270.89

... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.

160

1310

209608

... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. In cement mortar

172.62

1264

218303.88

... More
Hire and Labour charge for stagging made of Bamboo or Sal ballah prop with necessary cross bracing and fixture etc and removing the same after completion of work.1 nos of Chimney

490.63

120

58924.66

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.